| Roof design changed to boston hip. New truss plans and el... | 2026-06-04 | Amendment | profile | - | - |
| COMMERCIAL****modification of fire sprinkler system FOR A... | 2026-06-04 | Fire | profile | - | - |
| Roof design changed to boston hip. New truss plans and el... | 2026-06-04 | Amendment | profile | - | - |
| Foundation under the garage front wall area was found to ... | 2026-06-04 | Amendment | profile | - | - |
| Roof design changed to boston hip. New truss plans and el... | 2026-06-04 | Amendment | profile | - | - |
| Revision to the Home Depot approved site plan to add addi... | 2026-06-02 | Amendment | profile | - | - |
| CHANGING TO A PRIVATE PROVIDER FOR INSPECTIONS ONLY | 2026-06-02 | Amendment | profile | - | - |
| CHANGING TO PRIVATE PROVIDER | 2026-06-02 | Amendment | profile | - | - |
| Stair revisionsSheets 3,4,10 & 12 | 2026-06-01 | Amendment | profile | - | - |
| COMM-----Amendment to approved electrical drawings to add... | 2026-05-28 | Amendment | profile | - | - |
| Making another driveway on property with an apron. | 2026-05-28 | Amendment | profile | - | - |
| - House plans revised to show Skid to Slab attachment rev... | 2026-05-27 | Amendment | profile | - | - |
| Repair being done on Trusses | 2026-05-27 | Amendment | profile | - | - |
| ENGINEERED LETTER INSPECTOR REQUESTED | 2026-05-26 | Amendment | profile | - | - |
| Project Phasing: Phase 1: 1. construct rear office buildi... | 2026-05-22 | Amendment | profile | - | - |
| COMMERCIAL****The existing wet pipe fire sprinkler system... | 2026-05-22 | Fire | profile | - | - |
| Update of the equipment to be installed. | 2026-05-20 | Amendment | profile | - | - |
| Mechanical-Update of the equipment to be installed. | 2026-05-20 | Amendment | profile | - | - |
| Submission of signed and sealed engineered truss repair d... | 2026-05-20 | Amendment | profile | - | - |
| Changing sub contracting from bay area to air fx inc for ... | 2026-05-19 | Amendment | profile | - | - |
| Repair of cracked corner of front column | 2026-05-18 | Amendment | profile | - | - |
| Name of owner changing | 2026-05-18 | Amendment | profile | - | - |
| COMMERCIAL****Switched the smoke detector that was in the... | 2026-05-15 | Fire | profile | - | - |
| Revised Stormwater Plans | 2026-05-14 | Amendment | profile | - | - |
| Under Home Storage changing end wall to wood construction | 2026-05-14 | Amendment | profile | - | - |
| COMM-----Install new underground water supply piping for ... | 2026-05-13 | Fire | profile | - | - |
| COMM-----Install new underground fire water supply piping... | 2026-05-12 | Fire | profile | - | - |
| COMM----Install new underground fire water supply piping ... | 2026-05-12 | Fire | profile | - | - |
| Ceiling Changed - Please see sheet A-4 for the change fro... | 2026-05-11 | Amendment | profile | - | - |
| This amendment revises the approved site plan to shift th... | 2026-05-11 | Amendment | profile | - | - |
| I'm requesting an amendment to permit #BLD202507011. I fa... | 2026-05-11 | Amendment | profile | - | - |
| Footing inspection | 2026-05-11 | Amendment | profile | - | - |
| Revisions made to fire sprinkler design. | 2026-05-11 | Amendment | profile | - | - |
| Changing Stair Location from right side of home to Front ... | 2026-05-11 | Amendment | profile | - | - |
| Plans Ammendment to Show 3 courses of block for porch are... | 2026-05-08 | Amendment | profile | - | - |
| COMM----The existing wet pipe fire sprinkler system is to... | 2026-05-08 | Fire | profile | - | - |
| COMM----Modification of project to remove the Whataburger... | 2026-05-07 | Amendment | profile | - | - |
| Updated Stormwater Plans Showing Correct Vegetative Strip... | 2026-05-06 | Amendment | profile | - | - |
| RE-FINAL SURVEY - FEC Approved (05/29/2026) | 2026-05-06 | Amendment | profile | - | - |
| COMMERECIAL****Installation of new fire alarm system--NOC... | 2026-05-05 | Fire | profile | - | - |
| Framing modifications letter from Engineer | 2026-05-05 | Amendment | profile | - | - |
| Installation of a Ansul R102 fire suppression system | 2026-05-05 | Fire | profile | - | - |
| TEAROFF OLD SHINGLES ON MBH INSTALL BACK SYNTHETIC UNDERL... | 2026-05-04 | Roofing / Roof | profile | - | - |
| This amendment is being submitted to reflect a change in ... | 2026-05-01 | Amendment | profile | - | - |
| COMMERCIAL****Add and existing upright fire sprinklers to... | 2026-05-01 | Fire | profile | - | - |
| <div><font color="#d5000e">** REQUIRED TO BE APPLIED FOR ... | 2026-04-30 | Amendment | profile | - | - |
| Revision to stormwater | 2026-04-29 | Amendment | profile | - | - |
| EOR Letter | 2026-04-29 | Amendment | profile | - | - |
| COMMERCIAL****Installing 1 new shell wet fire sprinkler s... | 2026-04-28 | Fire | profile | - | - |
| ***COMM***Revised engineering for new location of sign. | 2026-04-24 | Amendment | profile | - | - |