Source Fields
{
"application_date": "2026-04-24",
"business_display_name": "Sunlight Enterprises Inc",
"completion_date": "2026-05-21",
"confidence_notes": "Issued permit name matched one contractor registry row by normalized business name.",
"contractor_license_number": "CCC1335481",
"contractor_name": "Sunlight Enterprises Inc",
"county": "Sumter",
"description": "Installation of a battery storage system integrated with the existing solar photovoltaic system. The scope includes connection to the current solar setup, installation of required equipment, and system configuration to ensure proper operation and energy storage functionality.",
"email": "[email protected]",
"issue_date": "2026-05-20",
"issued_report_name": "SUNLIGHT ENTERPRISES INC",
"join_confidence": "registry_name_exact",
"jurisdiction_scope": "Sumter County Citizenserve issued-permit report scope",
"legal_or_dba_name": "Sunlight Enterprises Inc",
"license_number": "CCC1335481",
"license_status": "expires 2026-08-31",
"license_type": "Roofing Contractor (State): CCC1335481 (08/31/2026)",
"mailing_or_firm_address": "1106 W Central blvd Orlando FL 32805",
"normalized_license_number": "CCC1335481",
"observed_project_value": 1600,
"parcel_id": "D25M238",
"permit_number": "EL26-000478",
"phone": "(P): (321) 888-3388",
"portal_key": "sumter_citizenserve",
"qualifier_name": "Katie Allman",
"raw_payload_path": "artifacts/source-probes/sumter-citizenserve/2026-06-05/sumter_citizenserve/raw/issued-2026-01-01-to-2026-06-05.html",
"scope_layer": "county_permitting_authority",
"site_address": "640 LITTLE RIVER PATH",
"source_fields_json": "{\"Address\":\"640 LITTLE RIVER PATH\",\"Application Date\":\"04/24/2026\",\"Completion Date\":\"05/21/2026\",\"Estimated Cost of Construction\":\"1600.00\",\"Issue Date\":\"05/20/2026\",\"Owners Name\":\"SUNLIGHT ENTERPRISES INC\",\"Parcel Number\":\"D25M238\",\"Permit Subtype\":\"New Service\",\"Permit Type\":\"Sumter County - Electrical Permit\",\"Permit#\":\"EL26-000478\",\"Project Name\":\"Installation of a battery storage system integrated with the existing solar photovoltaic system. The scope includes connection to the current solar setup, installation of required equipment, and system configuration to ensure proper operation and energy storage functionality.\",\"Status Code\":\"Finaled\",\"Subtype Details\":\"Installation of a battery storage system integrated with the existing solar photovoltaic system. The scope includes connection to the current solar setup, installation of required equipment, and system configuration to ensure proper operation and energy storage functionality.\"}",
"source_record_id": "CCC1335481",
"source_url": "Citizenserve report_ID=892 Issued Permits",
"state": "FL",
"status": "Finaled",
"work_date": "2026-05-20",
"work_event_id": "EL26-000478",
"work_type": "New Service / Installation of a battery storage system integrated with the existing solar photovoltaic system. The scope includes connection to the current solar setup, installation of required equipment, and system configuration to ensure proper operation and energy storage functionality.",
"work_value": "1600.00",
"work_value_source": "Sumter issued-permit report Estimated Cost of Construction"
}