Source Fields
{
"application_date": "2025-10-15",
"business_display_name": "Spectrum Sunshine State, LLC",
"completion_date": "",
"confidence_notes": "Issued permit owner/vendor/applicant text is name-only; no unique contractor registry license match.",
"contractor_license_number": "",
"contractor_name": "Spectrum Sunshine State, LLC",
"county": "Sumter",
"description": "INSTALL 5260 FEET OF 48-COUNT FIBER OPTIC CABLE. ENSURE A MINIMUM DEPTH OF 48\" UNDER THE ROADWAY, THIS INCLUDES (1) 1-2 INCH HDPE SDR 11 CONDUIT AND (1) 48-CT FIBER OPTIC CABLE. MAINTAIN A MINIMUM DEPTH OF 36\" THROUGHOUT THE ROADWAY. PRISM 5784569_2",
"email": "",
"issue_date": "2025-10-22",
"issued_report_name": "Spectrum Sunshine State, LLC",
"join_confidence": "issued_name_only",
"jurisdiction_scope": "Sumter County Citizenserve issued-permit report scope",
"legal_or_dba_name": "Spectrum Sunshine State, LLC",
"license_number": "",
"license_status": "",
"license_type": "",
"mailing_or_firm_address": "",
"normalized_license_number": "",
"observed_project_value": null,
"parcel_id": "S02-030",
"permit_number": "ROW25-000258",
"phone": "",
"portal_key": "sumter_citizenserve",
"qualifier_name": "",
"raw_payload_path": "artifacts/source-probes/sumter-citizenserve/2026-06-05/sumter_citizenserve/raw/issued-2025-01-01-to-2025-12-31.html",
"scope_layer": "county_permitting_authority",
"site_address": "1934 C 478A",
"source_fields_json": "{\"Address\":\"1934 C 478A\",\"Application Date\":\"10/15/2025\",\"Completion Date\":\"\",\"Estimated Cost of Construction\":\"null\",\"Issue Date\":\"10/22/2025\",\"Owners Name\":\"Spectrum Sunshine State, LLC\",\"Parcel Number\":\"S02-030\",\"Permit Subtype\":\"Utility\",\"Permit Type\":\"Sumter County - Right of Way\",\"Permit#\":\"ROW25-000258\",\"Project Name\":\"INSTALL 5260 FEET OF 48-COUNT FIBER OPTIC CABLE. ENSURE A MINIMUM DEPTH OF 48\\\" UNDER THE ROADWAY, THIS INCLUDES (1) 1-2 INCH HDPE SDR 11 CONDUIT AND (1) 48-CT FIBER OPTIC CABLE. MAINTAIN A MINIMUM DEPTH OF 36\\\" THROUGHOUT THE ROADWAY. PRISM 5784569_2\",\"Status Code\":\"Issued\",\"Subtype Details\":\"INSTALL 5260 FEET OF 48-COUNT FIBER OPTIC CABLE. ENSURE A MINIMUM DEPTH OF 48\\\" UNDER THE ROADWAY, THIS INCLUDES (1) 1-2 INCH HDPE SDR 11 CONDUIT AND (1) 48-CT FIBER OPTIC CABLE. MAINTAIN A MINIMUM DEPTH OF 36\\\" THROUGHOUT THE ROADWAY. PRISM 5784569_2\"}",
"source_record_id": "issued-name:spectrum sunshine state",
"source_url": "Citizenserve report_ID=892 Issued Permits",
"state": "FL",
"status": "Issued",
"work_date": "2025-10-22",
"work_event_id": "ROW25-000258",
"work_type": "Utility / INSTALL 5260 FEET OF 48-COUNT FIBER OPTIC CABLE. ENSURE A MINIMUM DEPTH OF 48\" UNDER THE ROADWAY, THIS INCLUDES (1) 1-2 INCH HDPE SDR 11 CONDUIT AND (1) 48-CT FIBER OPTIC CABLE. MAINTAIN A MINIMUM DEPTH OF 36\" THROUGHOUT THE ROADWAY. PRISM 5784569_2",
"work_value": "null",
"work_value_source": "Sumter issued-permit report Estimated Cost of Construction"
}