bluedoor data·Licensed Contractors API·bluedoor.sh ↗

HomeWork events**PRIVATE PROVIDER INSPECTIONS ONLY** Upline - restoratively clean/remove all debris fr...

**PRIVATE PROVIDER INSPECTIONS ONLY** Upline - restoratively clean/remove all debris fr...

Plumbing event dated 2023-08-23.

Work event

Work event PKevent_dabc5b9e799145a7ddf6
Work typeCommercial Plumbing
Work categoryPlumbing
Description**PRIVATE PROVIDER INSPECTIONS ONLY** Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack. This covers up to 2,020’ of cast iron drain lines. Downline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly. This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete. Additional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed. Additional Item: Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others. Additional Item: Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....
Work date2023-08-23
StatusClosed - Finaled
Source record IDBC-PLB-23-00026
JurisdictionPinellas County Accela Building jurisdiction

Location

Site address-
City-
County-
State-
Postal code-
Parcel ID-
Latitude-
Longitude-

Project value

Amount-
Type-
Source-
Confidence-

Provenance

Source URL-
Raw payload path-
Imported at-

Full work-event record

Work Event PKevent_dabc5b9e799145a7ddf6
Firm IDfirm_84ff34ab6558df7d85f1
Local Identity IDidentity_f19a98915a9d392d7e34
Portal Keypinellas_accela
Jurisdiction ScopePinellas County Accela Building jurisdiction
Source Record IDBC-PLB-23-00026
Work Event IDBC-PLB-23-00026
Work TypeCommercial Plumbing
Work Categoryplumbing
Description**PRIVATE PROVIDER INSPECTIONS ONLY** Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack. This covers up to 2,020’ of cast iron drain lines. Downline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly. This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete. Additional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed. Additional Item: Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others. Additional Item: Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....
Observed Project Value387,500
Value Typeconstruction_value
Value SourcePinellas Accela Value of Construction
Value Confidencehigh
Work Date2023-08-23
StatusClosed - Finaled
Site Address2450 GULF BLVD, BELLEAIR BEACH 33786
City-
StateFL
Postal Code-
CountyPinellas
Parcel ID302915473100000001
Latitude-
Longitude-
Source URLhttps://aca-prod.accela.com/PINELLAS/Cap/CapDetail.aspx?Module=Building&TabName=Buildin...
Raw Payload Pathartifacts/business-backfills/pinellas_accela/run_date=2026-06-05/08-23-2023_08-23-2023_type-all_pages-50_details-all.json
Imported At2026-06-05
Source Fields
{
  "business_display_name": "PIPE RESTORATION SOLUTIONS INC",
  "city": null,
  "confidence_notes": "Live Accela date-window import; value and contractor parsed from public CapDetail page.",
  "county": "Pinellas",
  "description": "**PRIVATE PROVIDER INSPECTIONS ONLY**  Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack.  This covers up to 2,020’ of cast iron drain lines. \r\n \r\nDownline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly.  This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete.  \r\n\r\nAdditional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed.\r\n                                                                                                  \t\r\nAdditional Item:  Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others.\t\r\n\r\nAdditional Item:  Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....",
  "email": "[email protected]",
  "insurance_or_bond_summary": null,
  "jurisdiction_scope": "Pinellas County Accela Building jurisdiction",
  "legal_or_dba_name": "PIPE RESTORATION SOLUTIONS INC",
  "license_number": "CFC1429221",
  "license_status": null,
  "license_type": "Plumbing Contractor  CFC1429221",
  "mailing_or_firm_address": "128 Sarasota Center Blvd",
  "parcel_id": "302915473100000001",
  "phone": "941544-3090",
  "portal_key": "pinellas_accela",
  "postal_code": null,
  "qualifier_name": "Sarasota, FL, 34240",
  "raw_payload_path": "artifacts/business-backfills/pinellas_accela/run_date=2026-06-05/08-23-2023_08-23-2023_type-all_pages-50_details-all.json",
  "scope_layer": "county_permitting_authority",
  "site_address": "2450 GULF BLVD, BELLEAIR BEACH 33786",
  "source_fields": {
    "detail": {
      "detail_text_sample": "Accela Citizen Access\nLogin\n|\nRegister for an Account\n|\nAnnouncements\n(\n)\n|\nMark as Read\nmore\nmore\nMessage Bar\nRecord\nBC-PLB-23-00026\n:\nCommercial Plumbing\nRecord Status:\nClosed - Finaled\nExpiration Date:\n09/07/2024\nCreate a New Collection\n*\nName:\nDescription:\nspell check\nAdd\nCancel\nRecord Info\nRecord Details\nProcessing Status\nAttachments\nInspections\nPayments\nFees\nConditions\nWork Location\n2450 GULF BLVD\nBELLEAIR BEACH 33786\n*\nRecord Details\nReplacing a\nwater heater, AC unit\nor\nwater softener\n? Virtual inspections are now available for these permit types.\nLearn more\n.\nVirtual inspections will be available for more permit types soon.\nLicensed Professional:\nJoshua Leon Shrock [email protected]\nPIPE RESTORATION SOLUTIONS INC\n128 Sarasota Center Blvd\nSarasota, FL, 34240\nPhone:\n800652-7604\nMobile Phone:\n941544-3090\nPlumbing Contractor  CFC1429221\nProject Description:\nBC - PRIVATE PROVIDER - BELLEAIR BELACH - PLUMBING - La Casa De Los Caracoles Condominium Assocation, Inc.\n**PRIVATE PROVIDER INSPECTIONS ONLY**  Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack.  This covers up to 2,020’ of cast iron drain lines.\nDownline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly.  This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete.\nAdditional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed.\nAdditional Item:  Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others.\nAdditional Item:  Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....\nOwner:\nLA CASA DE LOS CARACOLES CONDO ASSN\n*\n2180 W SR 434 STE 5000\nLONGWOOD FL 32779-5042\nMore Details\nRelated Contacts\nContractor information\nJoshua\nShrock\nPipe Restoration Solutions, Inc.\n128 Sarasota Center Blvd\nSarasota, FL, 34240\nMobile Phone:\n9415443090\nE-mail:\[email protected]\nBusiness\n128 Sarasota Center Blvd\nSarasota, FL, 34240\nApplication Information\nGENERAL INFO\nPermit Subtype:\nOther Plumbing Standalone\nBUILDING COM/RES INFO\nValue of Construction:\n387500\nWork Area:\n2880\nPrivate Provider Review:\nYes\nPrivate Provider Inspections:\nYes\nIs there an Associated Site Plan?:\nNo\nTotal Area Under Roof:\n2880\nTotal Conditioned Area:\n0\nBUILDING FLOOD INFO\nMisc Notes:\nBFE: 9'\nDFE: 10'\nHELENE 2024\nIs this application due to damage from Hurricane Helene?:\nNo\nIs this application due to damage from Hurricane Milton?:\nNo\nParcel Information\nParcel Number:302915473100000001\n*\nBlock:000\nLot:0001\nSubdivision:47310\nAIRPORT: N\nEVACZONE: A\nFIRE DISTRICT: Pinellas Suncoast\nFLOOD ZONE: AE\nGOVERNMENT OWNED: N\nHALF SECTION: 30S\nHISTORIC: N\nHOMESTEAD: N\nJURISDICTION: Belleair Beach\nSIZEACRES: 2.528 a\nUNINCORPORATED: N\nWELLHEAD: N\nCODEAREA: CodeArea4\nCODEENFORCEAREAS: North\nBLDGINSPAREAS: B6\nELECINSPAREAS: E3\nMECHINSPAREAS: M3\nPLMNINSPAREAS: P1\nPROTECTEDPARCEL: No\nMODIFYDATE: 12/11/2018\nFees\nAny outstanding fees assessed prior to October 12, 2020 may not be accurate, please\ncontact the agency for correct fees due and permit status\n.\nOutstanding\nbalances for permits prior to January 1, 2015 are not payable online\n. Please contact Pinellas County staff at 727-464-3888 to discuss payment options.\nLoading...\nInspections\nLoading...\nUpcoming\nB- = Building (For roofing-final select B-Final)\nC- = Chemical\nE- = Electrical\nG- = Gas\nH- = Hood\nM- = Mechanical (Virtual inspections available for AC replacements.)\nP- = Plumbing (Virtual inspections available for water heaters and water softeners.)\nR- = Refrigeration\nS- = Sprinkler\nYou have not added any",
      "job_value": "387500",
      "licensed_professional": {
        "city_state_zip": "Phone: 800652-7604",
        "company": "PIPE RESTORATION SOLUTIONS INC",
        "email": "[email protected]",
        "license_holder": "Sarasota, FL, 34240",
        "license_notes": "Plumbing Contractor  CFC1429221",
        "phones": {
          "mobile_phone": "941544-3090"
        },
        "street_address": "128 Sarasota Center Blvd"
      },
      "licensed_professional_raw": "Joshua Leon Shrock [email protected] | PIPE RESTORATION SOLUTIONS INC | 128 Sarasota Center Blvd | Sarasota, FL, 34240 | Phone: 800652-7604 | Mobile Phone: 941544-3090 | Plumbing Contractor  CFC1429221",
      "owner": "LA CASA DE LOS CARACOLES CONDO ASSN",
      "pcn": "302915473100000001",
      "value_label": "Value of Construction"
    },
    "grid_cells": [
      "",
      "08/23/2023",
      "Commercial Plumbing",
      "BC-PLB-23-00026",
      "Closed - Finaled",
      "",
      "2450 GULF BLVD, BELLEAIR BEACH 33786",
      "BC - PRIVATE PROVIDER - BELLEAIR BELACH - PLUMBING - La Casa De Los Caracoles Condominium Assocation, Inc.",
      "09/07/2024",
      "**PRIVATE PROVIDER INSPECTIONS ONLY**  Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack.  This covers up to 2,020’ of cast iron drain lines. \r\n \r\nDownline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly.  This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete.  \r\n\r\nAdditional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed.\r\n                                                                                                  \t\r\nAdditional Item:  Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others.\t\r\n\r\nAdditional Item:  Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....",
      "2450 GULF BLVD, BELLEAIR BEACH 33786"
    ],
    "grid_inferred": {
      "application_date": "08/23/2023",
      "description": "**PRIVATE PROVIDER INSPECTIONS ONLY**  Upline - restoratively clean/remove all debris from the underground cast iron lines and install structural CIPP liners for the 3” and 4” undergrounds from the cleanout access area located in concrete or pavers upline and into the base of the stack.  This covers up to 2,020’ of cast iron drain lines. \r\n \r\nDownline - restoratively clean/remove all debris from the downline underground made up of clay and cast iron from the cleanout access area located in concrete, asphalt or pavers. Once cleaned PRS will CIPP line each main properly.  This covers up to 860’of 4” and 6” cast iron / clay drain lines. Approx. 20-23 days to complete.  \r\n\r\nAdditional Item: Concrete holes will be necessary to access cleanouts. PRS will open a put back to grade, as needed.\r\n                                                                                                  \t\r\nAdditional Item:  Asphalt holes will be necessary to access cleanouts. PRS will open only, put back by others.\t\r\n\r\nAdditional Item:  Pavers holes will be necessary to access cleanouts. PRS will open only, put back by others. Pavers incased in concrete not included.....PLUMBING ONLY....",
      "record_type": "Commercial Plumbing",
      "site_address": "2450 GULF BLVD, BELLEAIR BEACH 33786",
      "status": "Closed - Finaled"
    },
    "work_category": "plumbing",
    "work_date_basis": "accela_grid_application_date"
  },
  "source_record_id": "BC-PLB-23-00026",
  "source_url": "https://aca-prod.accela.com/PINELLAS/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=23CAP&capID2=00000&capID3=00VUS&agencyCode=PINELLAS&IsToShowInspection=",
  "state": "FL",
  "status": "Closed - Finaled",
  "work_date": "2023-08-23",
  "work_event_id": "BC-PLB-23-00026",
  "work_type": "Commercial Plumbing",
  "work_value": 387500,
  "work_value_source": "Pinellas Accela Value of Construction"
}
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_dabc5b9e799145a7ddf6?include_source_fields=trueJSON
**PRIVATE PROVIDER INSPECTIONS ONLY** Upline - restoratively clean/... — Licensed Contractors data | bluedoor