bluedoor data·Licensed Contractors API·bluedoor.sh ↗

HomeWork events240V 150A 3phase electrical panel installation including main breaker 240V 150A 3phase ...

240V 150A 3phase electrical panel installation including main breaker 240V 150A 3phase ...

Electrical event dated 2025-02-20.

Work event

Work event PKevent_a19c79cde26c7a0dab10
Work typeResidential Trade Electrical
Work categoryElectrical
Description240V 150A 3phase electrical panel installation including main breaker 240V 150A 3phase meter can only installation 2 - 240V 60A 3phase fusible disconnect installation
Work date2025-02-20
StatusClosed-Certificate Issued
Source record IDBLD2025021184
JurisdictionMartin County Accela Building jurisdiction

Location

Site address-
City-
County-
State-
Postal code-
Parcel ID-
Latitude-
Longitude-

Project value

Amount-
Type-
Source-
Confidence-

Provenance

Source URL-
Raw payload path-
Imported at-

Full work-event record

Work Event PKevent_a19c79cde26c7a0dab10
Firm IDfirm_fe04b3fb71c5e5dc3197
Local Identity IDidentity_9f84b30f0586feee111f
Portal Keymartin_accela
Jurisdiction ScopeMartin County Accela Building jurisdiction
Source Record IDBLD2025021184
Work Event IDBLD2025021184
Work TypeResidential Trade Electrical
Work Categoryelectrical
Description240V 150A 3phase electrical panel installation including main breaker 240V 150A 3phase meter can only installation 2 - 240V 60A 3phase fusible disconnect installation
Observed Project Value3,580
Value Typejob_value
Value SourceMartin Accela JobValue
Value Confidencehigh
Work Date2025-02-20
StatusClosed-Certificate Issued
Site Address248 SW SALLY WAY, STUART FL 34997
CitySTUART
StateFL
Postal Code34997
CountyMartin
Parcel ID05-39-41-013-000-00002-0
Latitude27.113
Longitude-80.259
Source URLhttps://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Buildin...
Raw Payload Path-
Imported At2026-06-03
Source Fields
{
  "business_display_name": "V&R ELECTRIC, LLC",
  "city": "STUART",
  "confidence_notes": "Imported from existing Martin Accela permit detail table.",
  "county": "Martin",
  "description": "240V 150A 3phase electrical panel installation including main breaker\n240V 150A 3phase meter can only installation\n2 - 240V 60A 3phase fusible disconnect installation",
  "email": "[email protected]",
  "insurance_or_bond_summary": null,
  "jurisdiction_scope": "Martin County Accela Building jurisdiction",
  "latitude": 27.11259007,
  "legal_or_dba_name": "V&R ELECTRIC, LLC",
  "license_number": "EC13011024",
  "license_status": null,
  "license_type": "STATE CERT - ELECTRICAL  EC13011024",
  "longitude": -80.25869803,
  "mailing_or_firm_address": "562 SW LAKE CHARLES CIR. PORT ST. LUCIE FL 34986",
  "parcel_id": "05-39-41-013-000-00002-0",
  "phone": "7726312355",
  "portal_key": "martin_accela",
  "postal_code": "34997",
  "qualifier_name": "CENTER, JOHN CLIFFORD",
  "raw_payload_path": null,
  "scope_layer": "county_permitting_authority",
  "site_address": "248 SW SALLY WAY, STUART FL 34997",
  "source_record_id": "BLD2025021184",
  "source_url": "https://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC25&capID2=00000&capID3=004O5&agencyCode=MARTINCO&IsToShowInspection=",
  "state": "FL",
  "status": "Closed-Certificate Issued",
  "work_date": "2025-02-20",
  "work_event_id": "BLD2025021184",
  "work_type": "Residential Trade Electrical",
  "work_value": 3580,
  "work_value_source": "Martin Accela JobValue"
}
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_a19c79cde26c7a0dab10?include_source_fields=trueJSON
240V 150A 3phase electrical panel installation including main break... — Licensed Contractors data | bluedoor