In the master bathroom we will remove the existing tub, tile, shower trim, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using sloped shower pan. Install ½” durock and red guard on all surrounding shower walls. Shower valve will be relocated from the right wall to the left wall of shower. Shower head will remain on right wall. Shower trim will be upgraded with new Moen or Delta mixing valves. The wet walls/floor of shower will be tiled, we will install new vanity, sink and faucet.
Install LED lights above vanity and in shower. Replace electrical outlet and light switch to meet building code. There will be no increase in lighting loads for installation of LED lighting.
Level one alteration which includes or removes existing material by covering with new material for the same purpose.
Work date
2026-01-30
Status
Completed\Finaled
Source record ID
CP-299811
Jurisdiction
St. Lucie County EnerGov Building jurisdiction
Location
Site address
-
City
-
County
-
State
-
Postal code
-
Parcel ID
-
Latitude
-
Longitude
-
Project value
Amount
-
Type
-
Source
-
Confidence
-
Provenance
Source URL
-
Raw payload path
-
Imported at
-
Full work-event record
Work Event PK
event_97f1752d85b1c92deb23
Firm ID
firm_436ab97b23f56c222743
Local Identity ID
identity_e0be696f5dc0f072d8f1
Portal Key
stlucie_energov
Jurisdiction Scope
St. Lucie County EnerGov Building jurisdiction
Source Record ID
CP-299811
Work Event ID
BLDC-2601-004061
Work Type
Building Commercial - Alteration / Alteration
Work Category
commercial_building
Description
In the master bathroom we will remove the existing tub, tile, shower trim, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using sloped shower pan. Install ½” durock and red guard on all surrounding shower walls. Shower valve will be relocated from the right wall to the left wall of shower. Shower head will remain on right wall. Shower trim will be upgraded with new Moen or Delta mixing valves. The wet walls/floor of shower will be tiled, we will install new vanity, sink and faucet.
Install LED lights above vanity and in shower. Replace electrical outlet and light switch to meet building code. There will be no increase in lighting loads for installation of LED lighting.
Level one alteration which includes or removes existing material by covering with new material for the same purpose.