Home › Work events › Replace disconnect with 200 amp 3 phase 40 circuit panel with 200 amp main. Replace lay...
Replace disconnect with 200 amp 3 phase 40 circuit panel with 200 amp main. Replace lay...
Electrical event dated 2022-07-14.
Work event
| Work event PK | event_95d57b955a952adeb4ef |
| Work type | Commercial Electrical |
| Work category | Electrical |
| Description | Replace disconnect with 200 amp 3 phase 40 circuit panel with 200 amp main. Replace lay in lights and remove conduit from demo partitions and installed quad receptacles at ceiling level. |
| Work date | 2022-07-14 |
| Status | Closed-Certificate Issued |
| Source record ID | BLD2022070695 |
| Jurisdiction | Martin County Accela Building jurisdiction |
Location
| Site address | - |
| City | - |
| County | - |
| State | - |
| Postal code | - |
| Parcel ID | - |
| Latitude | - |
| Longitude | - |
Project value
| Amount | - |
| Type | - |
| Source | - |
| Confidence | - |
Provenance
| Source URL | - |
| Raw payload path | - |
| Imported at | - |
Full work-event record
| Work Event PK | event_95d57b955a952adeb4ef |
| Firm ID | firm_538d6ef0844ccac7730c |
| Local Identity ID | identity_d5cd3573d66ed05f8f3c |
| Portal Key | martin_accela |
| Jurisdiction Scope | Martin County Accela Building jurisdiction |
| Source Record ID | BLD2022070695 |
| Work Event ID | BLD2022070695 |
| Work Type | Commercial Electrical |
| Work Category | electrical |
| Description | Replace disconnect with 200 amp 3 phase 40 circuit panel with 200 amp main. Replace lay in lights and remove conduit from demo partitions and installed quad receptacles at ceiling level. |
| Observed Project Value | 2,350 |
| Value Type | job_value |
| Value Source | Martin Accela JobValue |
| Value Confidence | high |
| Work Date | 2022-07-14 |
| Status | Closed-Certificate Issued |
| Site Address | 275 SW MONTEREY RD, STUART FL 34994 |
| City | STUART |
| State | FL |
| Postal Code | 34994 |
| County | Martin |
| Parcel ID | 08-38-41-000-000-00240-7 |
| Latitude | 27.176 |
| Longitude | -80.257 |
| Source URL | https://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Buildin... |
| Raw Payload Path | - |
| Imported At | 2026-06-03 |
Source Fields
{
"business_display_name": "OCEANA ELECTRIC COMPANY",
"city": "STUART",
"confidence_notes": "Imported from existing Martin Accela permit detail table.",
"county": "Martin",
"description": "Replace disconnect with 200 amp 3 phase 40 circuit panel with 200 amp main.\nReplace lay in lights and remove conduit from demo partitions and installed quad receptacles at ceiling level.",
"email": "[email protected]",
"insurance_or_bond_summary": null,
"jurisdiction_scope": "Martin County Accela Building jurisdiction",
"latitude": 27.1761724609692,
"legal_or_dba_name": "OCEANA ELECTRIC COMPANY",
"license_number": "EC0001399",
"license_status": null,
"license_type": "STATE CERT - ELECTRICAL EC0001399",
"longitude": -80.2566772490702,
"mailing_or_firm_address": "1606 SE Village Green Dri PORT ST LUCIE FL 34952",
"parcel_id": "08-38-41-000-000-00240-7",
"phone": "7722242325",
"portal_key": "martin_accela",
"postal_code": "34994",
"qualifier_name": "ANDRADE, FRANK",
"raw_payload_path": null,
"scope_layer": "county_permitting_authority",
"site_address": "275 SW MONTEREY RD, STUART FL 34994",
"source_record_id": "BLD2022070695",
"source_url": "https://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC22&capID2=00000&capID3=00G0L&agencyCode=MARTINCO&IsToShowInspection=",
"state": "FL",
"status": "Closed-Certificate Issued",
"work_date": "2022-07-14",
"work_event_id": "BLD2022070695",
"work_type": "Commercial Electrical",
"work_value": 2350,
"work_value_source": "Martin Accela JobValue"
}Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_95d57b955a952adeb4ef?include_source_fields=trueJSON