Source Fields
{
"business_display_name": "ROOFING SOURCE",
"confidence_notes": "Mapped from Accela Building Search by Record Information plus CapDetail; date window and record type are public search criteria.",
"contractor_license_number": "CCC1329744",
"contractor_name": "ROOFING SOURCE",
"county": "Osceola",
"description": "Duro-Last 50mil PVC Recover Main Roof Level 1. Set up job site with safety equipment, dumpster, lift, tools and material. 2. Clean and prepare existing roof system for recover. Main roof section as highlighted in Red on the attached satellite image. 3. Remove RTU and parapet flashings, as needed. 4. Slice existing Duro-Last membrane in 10 ft x10 ft grid in preparation for recover. 5. Replace saturated insulation as needed. 6. Mechanically fasten 1/2\" fanfold insulation to roof field and build crickets as needed, for proper drainage. 7. Mechanically fasten 50mil White Duro-Last membrane to roof field. 8. Mechanically fasten 50mil White Duro-Last membrane to the parapet walls. Fold the new Duro-Last wall flashing up and over the perimeter parapet wall and secure to the outside of the wall with an Exceptional Metals Steel Fascia Base and a 24ga Kynar Coat Snap-on Cover. 9. Install all proper details for a complete Duro-Last roof system (T-Joints, Pipe Boots, Breather Vents, Corners ad Pitch Pockets) 10. Prepare gutter edge and properly flash in the Duro-Last membrane to the gutter edge. 11. Install approx. 50 LNF of walk pads at ladder entrance and at HVAC access panels. 12. Install a 5\" slip flashing to RTU's. 13. Clean and remove job site debris daily.mil PVC Recover Main Roof Level REROOF Manufacturer: Duro last, FL# or NOA# FL1559R19",
"email": "[email protected]",
"jurisdiction_scope": "Osceola County Citizen Access Building module",
"legal_or_dba_name": "ROOFING SOURCE",
"license_number": "CCC1329744",
"license_type": "ROOFING CONTRACTOR",
"mailing_or_firm_address": "6255 W Howard St Niles, IL, 60714",
"normalized_license_number": "CCC1329744",
"observed_project_value": "73991",
"parcel_id": "09252848040001001B",
"phone": "",
"portal_key": "osceola_accela_building",
"qualifier_name": "SCOTT JAY SWARM",
"raw_payload_path": "artifacts/business-backfills/osceola_accela_building/run_date=2026-06-05/date-2024-08-02_all-permit-types/grid-records.json",
"scope_layer": "county_permitting_authority",
"site_address": "5680 IRLO BRONSON MEM HWY, KISSIMMEE FL 34746",
"source_fields": {
"detail": {
"description": "COMM-Roofing [QP] 5680 West Irlo Bronson - Roof",
"job_value": "73991",
"licensed_professional": {
"company": "ROOFING SOURCE",
"description": "",
"email": "[email protected]",
"license_number": "CCC1329744",
"license_type": "ROOFING CONTRACTOR",
"mailing_address": "6255 W Howard St Niles, IL, 60714",
"parts": [
"SCOTT JAY SWARM [email protected]",
"ROOFING SOURCE",
"6255 W Howard St",
"Niles, IL, 60714",
"ROOFING CONTRACTOR CCC1329744"
],
"phone": "",
"qualifier_name": "SCOTT JAY SWARM",
"raw": "SCOTT JAY SWARM [email protected] | ROOFING SOURCE | 6255 W Howard St | Niles, IL, 60714 | ROOFING CONTRACTOR CCC1329744"
},
"owner": "",
"pcn": "09252848040001001B",
"record_type": "Roofing Permit",
"status": "Expired"
},
"grid": {
"cells": [
"",
"08/02/2024",
"A24-006912",
"Roofing Permit",
"COMM-Roofing [QP] 5680 West Irlo Bronson - Roof",
"5680 IRLO BRONSON MEM HWY, KISSIMMEE FL 34746",
"Expired",
"",
"Duro-Last 50mil PVC Recover Main Roof Level 1. Set up job site with safety equipment, dumpster, lift, tools and material. 2. Clean and prepare existing roof system for recover. Main roof section as highlighted in Red on the attached satellite image. 3. Remove RTU and parapet flashings, as needed. 4. Slice existing Duro-Last membrane in 10 ft x10 ft grid in preparation for recover. 5. Replace saturated insulation as needed. 6. Mechanically fasten 1/2\" fanfold insulation to roof field and build crickets as needed, for proper drainage. 7. Mechanically fasten 50mil White Duro-Last membrane to roof field. 8. Mechanically fasten 50mil White Duro-Last membrane to the parapet walls. Fold the new Duro-Last wall flashing up and over the perimeter parapet wall and secure to the outside of the wall with an Exceptional Metals Steel Fascia Base and a 24ga Kynar Coat Snap-on Cover. 9. Install all proper details for a complete Duro-Last roof system (T-Joints, Pipe Boots, Breather Vents, Corners ad Pitch Pockets) 10. Prepare gutter edge and properly flash in the Duro-Last membrane to the gutter edge. 11. Install approx. 50 LNF of walk pads at ladder entrance and at HVAC access panels. 12. Install a 5\" slip flashing to RTU's. 13. Clean and remove job site debris daily.mil PVC Recover Main Roof Level REROOF Manufacturer: Duro last, FL# or NOA# FL1559R19",
"",
"",
"5680 IRLO BRONSON MEM HWY, KISSIMMEE FL 34746"
],
"description": "Duro-Last 50mil PVC Recover Main Roof Level 1. Set up job site with safety equipment, dumpster, lift, tools and material. 2. Clean and prepare existing roof system for recover. Main roof section as highlighted in Red on the attached satellite image. 3. Remove RTU and parapet flashings, as needed. 4. Slice existing Duro-Last membrane in 10 ft x10 ft grid in preparation for recover. 5. Replace saturated insulation as needed. 6. Mechanically fasten 1/2\" fanfold insulation to roof field and build crickets as needed, for proper drainage. 7. Mechanically fasten 50mil White Duro-Last membrane to roof field. 8. Mechanically fasten 50mil White Duro-Last membrane to the parapet walls. Fold the new Duro-Last wall flashing up and over the perimeter parapet wall and secure to the outside of the wall with an Exceptional Metals Steel Fascia Base and a 24ga Kynar Coat Snap-on Cover. 9. Install all proper details for a complete Duro-Last roof system (T-Joints, Pipe Boots, Breather Vents, Corners ad Pitch Pockets) 10. Prepare gutter edge and properly flash in the Duro-Last membrane to the gutter edge. 11. Install approx. 50 LNF of walk pads at ladder entrance and at HVAC access panels. 12. Install a 5\" slip flashing to RTU's. 13. Clean and remove job site debris daily.mil PVC Recover Main Roof Level REROOF Manufacturer: Duro last, FL# or NOA# FL1559R19",
"detail": {
"description": "COMM-Roofing [QP] 5680 West Irlo Bronson - Roof",
"job_value": "73991",
"licensed_professional": {
"company": "ROOFING SOURCE",
"description": "",
"email": "[email protected]",
"license_number": "CCC1329744",
"license_type": "ROOFING CONTRACTOR",
"mailing_address": "6255 W Howard St Niles, IL, 60714",
"parts": [
"SCOTT JAY SWARM [email protected]",
"ROOFING SOURCE",
"6255 W Howard St",
"Niles, IL, 60714",
"ROOFING CONTRACTOR CCC1329744"
],
"phone": "",
"qualifier_name": "SCOTT JAY SWARM",
"raw": "SCOTT JAY SWARM [email protected] | ROOFING SOURCE | 6255 W Howard St | Niles, IL, 60714 | ROOFING CONTRACTOR CCC1329744"
},
"owner": "",
"pcn": "09252848040001001B",
"record_type": "Roofing Permit",
"status": "Expired"
},
"detail_url": "https://permits.osceola.org/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC24&capID2=00000&capID3=00RRB&agencyCode=OSCEOLA&IsToShowInspection=",
"headers": [
"",
"Date",
"Record Number",
"Record Type",
"Project Name",
"Address",
"Status",
"Action",
"Description",
"Expiration Date",
"Short Notes",
""
],
"hidden_record_id": "REC24-00000-00RRB",
"record_date": "08/02/2024",
"record_number": "A24-006912",
"record_type": "Roofing Permit",
"site_address": "5680 IRLO BRONSON MEM HWY, KISSIMMEE FL 34746",
"status": "Expired"
}
},
"source_record_id": "A24-006912",
"source_url": "https://permits.osceola.org/CitizenAccess/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC24&capID2=00000&capID3=00RRB&agencyCode=OSCEOLA&IsToShowInspection=",
"state": "FL",
"status": "Expired",
"work_date": "08/02/2024",
"work_event_id": "A24-006912",
"work_type": "Roofing Permit",
"work_value": "73991",
"work_value_source": "Osceola County Accela Citizen Access Building Applicant Job Value"
}