In the master bathroom we will remove the existing tub, tile, shower trim, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using pro-slope system. Install ½” durock and red guard on all surrounding shower walls. Shower valves will be relocated from the right wall to the left wall of shower. Shower head will remain on right wall. Shower trim will be upgraded. The wet walls/floor of shower will be tiled, we will install new vanity, sink and faucet. Installing LED lighting above vanity and in shower.
Work date
2026-01-15
Status
Completed\Finaled
Source record ID
CP-299811
Jurisdiction
St. Lucie County EnerGov Building jurisdiction
Location
Site address
-
City
-
County
-
State
-
Postal code
-
Parcel ID
-
Latitude
-
Longitude
-
Project value
Amount
-
Type
-
Source
-
Confidence
-
Provenance
Source URL
-
Raw payload path
-
Imported at
-
Full work-event record
Work Event PK
event_8ce76335dd392273667b
Firm ID
firm_436ab97b23f56c222743
Local Identity ID
identity_e0be696f5dc0f072d8f1
Portal Key
stlucie_energov
Jurisdiction Scope
St. Lucie County EnerGov Building jurisdiction
Source Record ID
CP-299811
Work Event ID
BLDC-2512-004001
Work Type
Building Commercial - Alteration / Alteration
Work Category
commercial_building
Description
In the master bathroom we will remove the existing tub, tile, shower trim, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using pro-slope system. Install ½” durock and red guard on all surrounding shower walls. Shower valves will be relocated from the right wall to the left wall of shower. Shower head will remain on right wall. Shower trim will be upgraded. The wet walls/floor of shower will be tiled, we will install new vanity, sink and faucet. Installing LED lighting above vanity and in shower.