guest bathroom remove exising shower doors, shower pan, shower
trim, sink, fixtures and vanity. We will install a new shower pan using pro-slope Install durock and red guard on all surrounding shower walls. Shower valve is currently on the right side of the shower wall. The shower valve will be moved to left side of the shower wall. Shower trim will be upgraded. Install new vanity with sink and faucet.
New LED lighing will be installed above vanity and shower. Running new electrical for LED mirror, outlets and switches will be brought up to building code.
Work date
2025-12-12
Status
Completed\Finaled
Source record ID
CP-299811
Jurisdiction
St. Lucie County EnerGov Building jurisdiction
Location
Site address
-
City
-
County
-
State
-
Postal code
-
Parcel ID
-
Latitude
-
Longitude
-
Project value
Amount
-
Type
-
Source
-
Confidence
-
Provenance
Source URL
-
Raw payload path
-
Imported at
-
Full work-event record
Work Event PK
event_8848993241c7c8cd1aa9
Firm ID
firm_436ab97b23f56c222743
Local Identity ID
identity_e0be696f5dc0f072d8f1
Portal Key
stlucie_energov
Jurisdiction Scope
St. Lucie County EnerGov Building jurisdiction
Source Record ID
CP-299811
Work Event ID
BLDC-2510-003871
Work Type
Building Commercial - Alteration / Alteration
Work Category
commercial_building
Description
guest bathroom remove exising shower doors, shower pan, shower
trim, sink, fixtures and vanity. We will install a new shower pan using pro-slope Install durock and red guard on all surrounding shower walls. Shower valve is currently on the right side of the shower wall. The shower valve will be moved to left side of the shower wall. Shower trim will be upgraded. Install new vanity with sink and faucet.
New LED lighing will be installed above vanity and shower. Running new electrical for LED mirror, outlets and switches will be brought up to building code.