bluedoor data·Licensed Contractors API·bluedoor.sh ↗

HomeWork eventsDisconnect existing generator, reconnect line to new generator with new 2nd stage regul...

Disconnect existing generator, reconnect line to new generator with new 2nd stage regul...

Residential Building event dated 2020-03-03.

Work event

Work event PKevent_789544491291b2f00f0b
Work typeResidential Gas Line Installation
Work categoryResidential Building
DescriptionDisconnect existing generator, reconnect line to new generator with new 2nd stage regulator
Work date2020-03-03
StatusClosed-Certificate Issued
Source record IDBLD2020030109
JurisdictionMartin County Accela Building jurisdiction

Location

Site address-
City-
County-
State-
Postal code-
Parcel ID-
Latitude-
Longitude-

Project value

Amount-
Type-
Source-
Confidence-

Provenance

Source URL-
Raw payload path-
Imported at-

Full work-event record

Work Event PKevent_789544491291b2f00f0b
Firm IDfirm_5eb49e907e8f45a8bda2
Local Identity IDidentity_c895c9bdfbf05db32089
Portal Keymartin_accela
Jurisdiction ScopeMartin County Accela Building jurisdiction
Source Record IDBLD2020030109
Work Event IDBLD2020030109
Work TypeResidential Gas Line Installation
Work Categoryresidential_building
DescriptionDisconnect existing generator, reconnect line to new generator with new 2nd stage regulator
Observed Project Value495
Value Typejob_value
Value SourceMartin Accela JobValue
Value Confidencehigh
Work Date2020-03-03
StatusClosed-Certificate Issued
Site Address2319 SW TRAILSIDE PATH, STUART FL 34997
CitySTUART
StateFL
Postal Code34997
CountyMartin
Parcel ID01-40-40-001-000-00100-0
Latitude27.028
Longitude-80.302
Source URLhttps://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Buildin...
Raw Payload Path-
Imported At2026-06-03
Source Fields
{
  "business_display_name": "ENERGIZED GAS INC",
  "city": "STUART",
  "confidence_notes": "Imported from existing Martin Accela permit detail table.",
  "county": "Martin",
  "description": "Disconnect existing generator, reconnect line to new generator with new 2nd stage regulator",
  "email": "[email protected]",
  "insurance_or_bond_summary": null,
  "jurisdiction_scope": "Martin County Accela Building jurisdiction",
  "latitude": 27.0279792148791,
  "legal_or_dba_name": "ENERGIZED GAS INC",
  "license_number": null,
  "license_status": null,
  "license_type": "LIQUEFIED PETROLEUM GAS  34747COWDELL",
  "longitude": -80.3019902566504,
  "mailing_or_firm_address": "4252 BANDY BLVD FORT PIERCE FL 34981",
  "parcel_id": "01-40-40-001-000-00100-0",
  "phone": "7728773440",
  "portal_key": "martin_accela",
  "postal_code": "34997",
  "qualifier_name": "COWDELL, BLAKE W",
  "raw_payload_path": null,
  "scope_layer": "county_permitting_authority",
  "site_address": "2319 SW TRAILSIDE PATH, STUART FL 34997",
  "source_record_id": "BLD2020030109",
  "source_url": "https://aca-prod.accela.com/MARTINCO/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=REC20&capID2=00000&capID3=004CQ&agencyCode=MARTINCO&IsToShowInspection=",
  "state": "FL",
  "status": "Closed-Certificate Issued",
  "work_date": "2020-03-03",
  "work_event_id": "BLD2020030109",
  "work_type": "Residential Gas Line Installation",
  "work_value": 495,
  "work_value_source": "Martin Accela JobValue"
}
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_789544491291b2f00f0b?include_source_fields=trueJSON
Disconnect existing generator, reconnect line to new generator with... — Licensed Contractors data | bluedoor