| Work type | Electrical Residential - Service Change / Service Change |
| Work category | Electrical |
| Description | Replace existing 200a main panel and branch - circuit breakers. Install new WP 200a Main breaker panel under existing meter can. Install all new branch circuit breakers and re-route conductors to new panel. Install surge protection in new main panel. Install 2nd ground rod and bond to existing grounding electrobe system. Install intersystem bonding terminal and bond to existing grounding electrode system. Remove interior of existing garage panel and use for junction box. Rehook 50a generator power inlet to new main panel. Install GFI protected receptacle in garage for water equipment. |
| Work date | 2025-02-05 |
| Status | Completed\Finaled |
| Source record ID | CP-58832 |
| Jurisdiction | St. Lucie County EnerGov Building jurisdiction |
Location
| Site address | - |
| City | - |
| County | - |
| State | - |
| Postal code | - |
| Parcel ID | - |
| Latitude | - |
| Longitude | - |
Project value
| Amount | - |
| Type | - |
| Source | - |
| Confidence | - |
Provenance
| Source URL | - |
| Raw payload path | - |
| Imported at | - |
Full work-event record
| Work Event PK | event_59808e3aaf9d609954d0 |
| Firm ID | firm_dd360fa4e081692bb769 |
| Local Identity ID | identity_91cfe172c4a0290e431c |
| Portal Key | stlucie_energov |
| Jurisdiction Scope | St. Lucie County EnerGov Building jurisdiction |
| Source Record ID | CP-58832 |
| Work Event ID | ELER-2501-005563 |
| Work Type | Electrical Residential - Service Change / Service Change |
| Work Category | electrical |
| Description | Replace existing 200a main panel and branch - circuit breakers. Install new WP 200a Main breaker panel under existing meter can. Install all new branch circuit breakers and re-route conductors to new panel. Install surge protection in new main panel. Install 2nd ground rod and bond to existing grounding electrobe system. Install intersystem bonding terminal and bond to existing grounding electrode system. Remove interior of existing garage panel and use for junction box. Rehook 50a generator power inlet to new main panel. Install GFI protected receptacle in garage for water equipment. |
| Observed Project Value | 2,925 |
| Value Type | valuation |
| Value Source | St. Lucie EnerGov ValuationValue |
| Value Confidence | high |
| Work Date | 2025-02-05 |
| Status | Completed\Finaled |
| Site Address | 5808 Killarney Fort Pierce FL 34951 |
| City | Fort Pierce |
| State | FL |
| Postal Code | 34951 |
| County | St. Lucie |
| Parcel ID | 130161300010006 |
| Latitude | - |
| Longitude | - |
| Source URL | https://stluciecountyfl-energovpub.tylerhost.net/apps/selfservice/api/energov/permits/p... |
| Raw Payload Path | artifacts/business-backfills/stlucie_energov/run_date=2026-06-03/kw-all_dates-2025-02-01..2025-02-07_field-issue_pages-1-10_size-100_sm-2_fm-2_details-all.json.gz |
| Imported At | 2026-06-03 |
Source Fields
{
"source_kind": "stlucie_energov_compact",
"attachments_total": 4,
"contacts_total": 4,
"square_feet": 0,
"date_field": "issue",
"work_date_basis": "IssueDate"
}Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_59808e3aaf9d609954d0?include_source_fields=trueJSON