Source Fields
{
"application_date": "2025-12-22",
"business_display_name": "All State Plumbing Services, Inc.",
"completion_date": "2026-02-06",
"confidence_notes": "Issued permit name matched one contractor registry row by normalized business name.",
"contractor_license_number": "CFC057323",
"contractor_name": "All State Plumbing Services, Inc.",
"county": "Sumter",
"description": "ALTERATION: Remove existing prefabricated stall and pan and replace with prefabricated shower pan and three wall system. New plumbing connects to existing drain and water supply lines. NO CHANGE TO EXISTING FLOOR PLAN",
"email": "[email protected]",
"issue_date": "2026-01-16",
"issued_report_name": "All State Plumbing Services, Inc.",
"join_confidence": "registry_name_exact",
"jurisdiction_scope": "Sumter County Citizenserve issued-permit report scope",
"legal_or_dba_name": "All State Plumbing Services, Inc.",
"license_number": "CFC057323",
"license_status": "expires 2026-08-31",
"license_type": "Plumbing Contractor (State): CFC057323 (08/31/2026)",
"mailing_or_firm_address": "540 E Minnehaha Ave Clermont FL 34711",
"normalized_license_number": "CFC057323",
"observed_project_value": 2000,
"parcel_id": "D16V039",
"permit_number": "P25-000342",
"phone": "(P): (352) 874-4225",
"portal_key": "sumter_citizenserve",
"qualifier_name": "Joel Casimiro",
"raw_payload_path": "artifacts/source-probes/sumter-citizenserve/2026-06-05/sumter_citizenserve/raw/issued-2026-01-01-to-2026-06-05.html",
"scope_layer": "county_permitting_authority",
"site_address": "2330 PINE RIDGE ST",
"source_fields_json": "{\"Address\":\"2330 PINE RIDGE ST\",\"Application Date\":\"12/22/2025\",\"Completion Date\":\"02/06/2026\",\"Estimated Cost of Construction\":\"2000.00\",\"Issue Date\":\"01/16/2026\",\"Owners Name\":\"All State Plumbing Services, Inc.\",\"Parcel Number\":\"D16V039\",\"Permit Subtype\":\"Alteration\",\"Permit Type\":\"Sumter County - Plumbing Permit\",\"Permit#\":\"P25-000342\",\"Project Name\":\"ALTERATION: Remove existing prefabricated stall and pan and replace with prefabricated shower pan and three wall system. New plumbing connects to existing drain and water supply lines. NO CHANGE TO EXISTING FLOOR PLAN\",\"Status Code\":\"Finaled\",\"Subtype Details\":\"ALTERATION: Remove existing prefabricated stall and pan and replace with prefabricated shower pan and three wall system. New plumbing connects to existing drain and water supply lines. NO CHANGE TO EXISTING FLOOR PLAN\"}",
"source_record_id": "CFC057323",
"source_url": "Citizenserve report_ID=892 Issued Permits",
"state": "FL",
"status": "Finaled",
"work_date": "2026-01-16",
"work_event_id": "P25-000342",
"work_type": "Alteration / ALTERATION: Remove existing prefabricated stall and pan and replace with prefabricated shower pan and three wall system. New plumbing connects to existing drain and water supply lines. NO CHANGE TO EXISTING FLOOR PLAN",
"work_value": "2000.00",
"work_value_source": "Sumter issued-permit report Estimated Cost of Construction"
}