Source Fields
{
"business_display_name": "COREY COMBES",
"city": null,
"confidence_notes": "Live Accela date-window import; value and contractor parsed from public CapDetail page.",
"county": "Lee",
"description": "****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechanical tool or adhesive. To complete the TPO installation process and effectively insulate the roof, a hot air gun, or hot air welder, is used to seal the seams of the TPO material together.",
"email": null,
"insurance_or_bond_summary": null,
"jurisdiction_scope": "Lee County Accela Permitting jurisdiction",
"legal_or_dba_name": "COREY COMBES",
"license_number": "CBC1262421",
"license_status": null,
"license_type": "Certified Building Cntr CBC1262421",
"mailing_or_firm_address": "CBC HOMES INC TAMPA FL 33617",
"parcel_id": "264521260000000",
"phone": null,
"portal_key": "lee_accela",
"postal_code": null,
"qualifier_name": "5128 PURITAN RD",
"raw_payload_path": "artifacts/business-backfills/lee_accela/run_date=2026-06-03/07-17-2023_07-17-2023_type-all_pages-50_details-all.json",
"scope_layer": "county_permitting_authority",
"site_address": "2500 BEACH VILLAS, CAPTIVA FL 33924",
"source_fields": {
"detail": {
"detail_text_sample": "Accela Citizen Access\nLogin\n|\nRegister for an Account\n|\nAnnouncements\n(\n)\n|\nMark as Read\nTip:\nThe Global Search can be used for quick searches, using a case number, address, strap number (no special characters), or license number.\nNew Record Creation & Document Uploading:\nReport Issues, Ask Questions, Provide Feedback, or Request Training\nhere\n. For more information about uploading documents using our new Digital Projects feature, click\nhere\n.\nCredit Card & Payment Info:\nLee County Government staff will never call you and ask for credit card or other sensitive information. Please report all fraudulent activity to the Lee County Sheriff's Office Fraud Unit at 239-258-3292.\nmore\nmore\nMessage Bar\nRecord\nCOM2023-02087\n:\nCommercial Alteration to Primary Structure (includes Buildout; excludes additional square footage)\nRecord Status:\nClosed-Voided\nClick here for more information\nCreate a New Collection\n*\nName:\nDescription:\nspell check\nAdd\nCancel\nRecord Info\nRecord Details\nProcessing Status\nRelated Records\nInspections\nPayments\nFees\nConditions\nStandard Conditions (which may or may not apply to your record) were added on\n07/17/2023\n.\nCondition:\nPrivate Provider Project Certification\nSeverity:\nRequired\nTotal Conditions:\n4\n(Required: 4, Met: 1)\nView Condition\nConditions\nImportant Note:\nConditions are automatically loaded on all records, based on specific criteria, however, some conditions may not be applicable to the project. These conditions will be reviewed on a case-by-case basis, by the Agency, during the application process. Only those deemed necessary will need to be met. The conditions will be signed off by the Agency, as they are met.\nShowing 1-5 of 5\nPermitting\n- 4 Applied, 1 Not Applicable\nPermitting\nPrivate Provider Project Certification\nFinal paperwork, certifying completion of project by Private Provider required, prior to CO/CC being released.\nApplied | 07/17/2023\nNotice of Commencement\nA notice of commencement may be required, depending on the job valuation, before permit issuance.\nApplied | 07/17/2023\nAdditional Documents Required\nIf additional documentation/information is required, it will be listed here.\nApplied | 07/17/2023\nOwner Builder Affidavit\nAn Owner/Builder Affidavit is required to be submitted in person to the Agency, at permit issuance, if permit being pulled as Owner/Builder.\nApplied | 07/17/2023\nPrivate Provider Intake Checklist\nStaff to Confirm:\n1. Private Provider Plan Compliance Affidavit Received (if Provider Provider performing Plan Review)\n2. Notice to Building Official of Use of Private Provider Received\n3. Plans stamped by Private Provider (if Private Provider performing Plan Review)\n4. Private Provider is registered (license/insurance current)\nNot Applicable | 07/19/2023\nWork Location\n2500 BEACH VILLAS\nCAPTIVA FL 33924\n*\nRecord Details\nIMPORTANT NOTE:\nFor Record Dates (i.e. Received Date, Issued Date, Expiration Date and Finaled Date) or Certificates of Occupancy, Compliance & Use, click Reports at the top of the page, and select the appropriate report name. Certificates of Occupancy, Compliance & Use are only available for records in Closed-CO Issued, Closed-CC Issued, and Closed-Cert of Use Issued, record status.\nApplicant:\nCorey\nCombes\n5128 Puritan RD\nTampa,\nFL,\n33617\nPrimary Phone:\n8134003329\[email protected]\nLicensed Professional:\nCOREY COMBES\nCBC HOMES INC\n5128 PURITAN RD\nTAMPA, FL, 33617\nPrimary Phone:\n8134003329\nCertified Building Cntr CBC1262421\nProject Description:\nHurricane Damage 2500 Beach Villas\n****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechan",
"job_value": "",
"licensed_professional": {
"city": "TAMPA",
"city_state_zip": "TAMPA, FL, 33617",
"company": "COREY COMBES",
"license_holder": "5128 PURITAN RD",
"license_notes": "Certified Building Cntr CBC1262421",
"phones": {
"primary_phone": "8134003329"
},
"postal_code": "33617",
"state": "FL",
"street_address": "CBC HOMES INC"
},
"licensed_professional_raw": "COREY COMBES | CBC HOMES INC | 5128 PURITAN RD | TAMPA, FL, 33617 | Primary Phone: 8134003329 | Certified Building Cntr CBC1262421",
"owner": "",
"pcn": "264521260000000",
"value_label": ""
},
"grid_cells": [
"",
"COM2023-02087",
"2500 BEACH VILLAS, CAPTIVA FL 33924",
"****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechanical tool or adhesive. To complete the TPO installation process and effectively insulate the roof, a hot air gun, or hot air welder, is used to seal the seams of the TPO material together.",
"Closed-Voided",
"",
"0",
"ePlan",
"2500 BEACH VILLAS, CAPTIVA FL 33924"
],
"grid_inferred": {
"application_date": null,
"description": "****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechanical tool or adhesive. To complete the TPO installation process and effectively insulate the roof, a hot air gun, or hot air welder, is used to seal the seams of the TPO material together.",
"record_type": "****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechanical tool or adhesive. To complete the TPO installation process and effectively insulate the roof, a hot air gun, or hot air welder, is used to seal the seams of the TPO material together.",
"site_address": "2500 BEACH VILLAS, CAPTIVA FL 33924",
"status": "Closed-Voided"
},
"search_window": {
"end": "07/17/2023",
"start": "07/17/2023"
},
"work_category": "roofing",
"work_date_basis": "accela_search_window_fallback"
},
"source_record_id": "COM2023-02087",
"source_url": "https://aca-prod.accela.com/LEECO/Cap/CapDetail.aspx?Module=Permitting&TabName=Permitting&capID1=23CAP&capID2=00000&capID3=01UTH&agencyCode=LEECO&IsToShowInspection=",
"state": "FL",
"status": "Closed-Voided",
"work_date": "2023-07-17",
"work_event_id": "COM2023-02087",
"work_type": "****VOID****Remove existing roof covering, nail deck to current code, install fully adhered high temperature underlayment, install 1 1/2\" standing seam metal panels directly attached to the deck using slotted clips and approved fasteners. Prep the existing roof by cleaning it, and if needed, removing any existing covering, then laying down the TPO material. Once the TPO membrane has been rolled out over the roof, it is secured to the roof’s cover board with a mechanical tool or adhesive. To complete the TPO installation process and effectively insulate the roof, a hot air gun, or hot air welder, is used to seal the seams of the TPO material together.",
"work_value": null,
"work_value_source": "Lee Accela Accela public detail value"
}