Source Fields
{
"business_display_name": "Owner Builder UNLICENSED",
"city": null,
"confidence_notes": "Live Accela date-window import; value and contractor parsed from public CapDetail page.",
"county": "Pinellas",
"description": "**05/29/2025 Second Renewal** Approximately 30ft of the sewer line under the concrete slab of the house (not beyond the walls of the house), require replacement due to an active blockage. In addition, approximately 5ft of additional sewer line will be installed to accompany a new kitchen including an island. The kitchen island will have water and electric (dishwasher, outlets) via the trench. Additional outlets will be installed to the walls of the kitchen for appliances and for countertop outlets. Water will also be supplied at the kitchen wall for appliances (i.e. refrigerator). New cabinets will be installed. A new wall will be constructed containing a door frame and outlets.\r\nThe following outlines the work to be done in order:\r\n(1) Create a trench of approximately 30ft in concrete enabling access to existing sewer line and additional trench of approximately 5ft to enable ability to install sewer, water, and electric for new kitchen island. (2) Remove approximately 30ft of existing cast-iron sewer line and replace with PVC, install sewer drain for kitchen island (rough in including island vent), install water lines for kitchen island and for kitchen wall. (3) Route electrical conduit/wire to location of kitchen island (to be connected to panel later) (4) Treat and fill trench as well as repair concrete slab and level floor. (5) Install kitchen outlets for appliances (stove/range, microwave, hood, refrigerator, etc) and for general use. (6) Install kitchen cabinets and install kitchen island outlets for dishwasher, garbage disposal, general use. (7) Install new wall in previously existing frame which is to include outlets and one door frame....B/E/P/M...NOC REQ ON SITE****HOMEOWNER IS SUB ALL TRADES***SUPPLEMENT Addition of bathroom within existing interior. Addition of DWV group under concrete slab, slab repair (including insecticide and vapor), interior non-load bearing walls/doors, above ground electrical and water lines. See permit attachments for revised layout.*****SUPPLEMENT Resizing existing windows to smaller openings with cinder block infill. Creating three window openings where two previously existed, including one opening converted into two smaller windows with block in between. Replacing two windows in existing sizes. Infill of existing sliding glass door with concrete block. A subcontractor is being added for this work. See attachments “Subcontractor Form rev 2025.09.01” and “Window Layout Diagram.”",
"email": null,
"insurance_or_bond_summary": null,
"jurisdiction_scope": "Pinellas County Accela Building jurisdiction",
"legal_or_dba_name": "Owner Builder UNLICENSED",
"license_number": null,
"license_status": null,
"license_type": null,
"mailing_or_firm_address": "",
"parcel_id": "053015359820060070",
"phone": null,
"portal_key": "pinellas_accela",
"postal_code": null,
"qualifier_name": null,
"raw_payload_path": "artifacts/business-backfills/pinellas_accela/run_date=2026-06-05/10-23-2023_10-23-2023_type-all_pages-50_details-all.json",
"scope_layer": "county_permitting_authority",
"site_address": "3654 AVOCADO RD, LARGO 33770",
"source_fields": {
"detail": {
"detail_text_sample": "Accela Citizen Access\nLogin\n|\nRegister for an Account\n|\nAnnouncements\n(\n)\n|\nMark as Read\nmore\nmore\nMessage Bar\nRecord\nBR-RMR-23-01124\n:\nResidential Remodel/Repair/Renovation\nRecord Status:\nIssued\nExpiration Date:\n10/19/2026\nCreate a New Collection\n*\nName:\nDescription:\nspell check\nAdd\nCancel\nRecord Info\nRecord Details\nProcessing Status\nAttachments\nInspections\nPayments\nFees\nConditions\nWork Location\n3654 AVOCADO RD\nLARGO 33770\n*\nRecord Details\nReplacing a\nwater heater, AC unit\nor\nwater softener\n? Virtual inspections are now available for these permit types.\nLearn more\n.\nVirtual inspections will be available for more permit types soon.\nLicensed Professional:\nOwner Builder UNLICENSED\nProject Description:\nRS - INT. / EXT. REMODEL - VANBUSKIRK - 10/23/2023 - 3654 Avocado Rd - Sewer Line replacement and Kitchen Installation\n**05/29/2025 Second Renewal** Approximately 30ft of the sewer line under the concrete slab of the house (not beyond the walls of the house), require replacement due to an active blockage. In addition, approximately 5ft of additional sewer line will be installed to accompany a new kitchen including an island. The kitchen island will have water and electric (dishwasher, outlets) via the trench. Additional outlets will be installed to the walls of the kitchen for appliances and for countertop outlets. Water will also be supplied at the kitchen wall for appliances (i.e. refrigerator). New cabinets will be installed. A new wall will be constructed containing a door frame and outlets.\nThe following outlines the work to be done in order:\n(1) Create a trench of approximately 30ft in concrete enabling access to existing sewer line and additional trench of approximately 5ft to enable ability to install sewer, water, and electric for new kitchen island. (2) Remove approximately 30ft of existing cast-iron sewer line and replace with PVC, install sewer drain for kitchen island (rough in including island vent), install water lines for kitchen island and for kitchen wall. (3) Route electrical conduit/wire to location of kitchen island (to be connected to panel later) (4) Treat and fill trench as well as repair concrete slab and level floor. (5) Install kitchen outlets for appliances (stove/range, microwave, hood, refrigerator, etc) and for general use. (6) Install kitchen cabinets and install kitchen island outlets for dishwasher, garbage disposal, general use. (7) Install new wall in previously existing frame which is to include outlets and one door frame....B/E/P/M...NOC REQ ON SITE****HOMEOWNER IS SUB ALL TRADES***SUPPLEMENT Addition of bathroom within existing interior. Addition of DWV group under concrete slab, slab repair (including insecticide and vapor), interior non-load bearing walls/doors, above ground electrical and water lines. See permit attachments for revised layout.*****SUPPLEMENT Resizing existing windows to smaller openings with cinder block infill. Creating three window openings where two previously existed, including one opening converted into two smaller windows with block in between. Replacing two windows in existing sizes. Infill of existing sliding glass door with concrete block. A subcontractor is being added for this work. See attachments “Subcontractor Form rev 2025.09.01” and “Window Layout Diagram.”\nOwner:\nVANBUSKIRK, CHRISTOPHER\n*\n3654 AVOCADO RD\nLARGO FL 33770\nMore Details\nRelated Contacts\nOwner information\nChristopher\nVanBuskirk\nVANBUSKIRK, CHRISTOPHER\n3654 AVOCADO RD\nLARGO, FL, 33770\nMobile Phone:\n5702694061\nE-mail:\[email protected]\nApplication Information\nGENERAL INFO\nPermit Subtype:\nInterior Remodel\nNumber of Dwelling Units:\n1\nIs this an owner/builder Permit?:\nYes\nBUILDING COM/RES INFO\nValue of Construction:\n8000\nWork Area:\n235\nPrivate Provider Review:\nNo\nPrivate Provider Inspections:\nNo\nIs there an Associated Site Plan?:\nNo\nTotal Area Under Roof:\n1484\nTotal Conditioned Area:\n1664\nBUILDING FLOOD INFO\nMisc Notes:\nMATCH EXISTING\nHELENE 2024\nIs this application due to damage from Hurri",
"job_value": "8000",
"licensed_professional": {
"company": "Owner Builder UNLICENSED"
},
"licensed_professional_raw": "Owner Builder UNLICENSED",
"owner": "VANBUSKIRK, CHRISTOPHER",
"pcn": "053015359820060070",
"value_label": "Value of Construction"
},
"grid_cells": [
"",
"10/23/2023",
"Residential Remodel/Repair/Renovation",
"BR-RMR-23-01124",
"Issued",
"",
"3654 AVOCADO RD, LARGO 33770",
"RS - INT. / EXT. REMODEL - VANBUSKIRK - 10/23/2023 - 3654 Avocado Rd - Sewer Line replacement and Kitchen Installation",
"10/19/2026",
"**05/29/2025 Second Renewal** Approximately 30ft of the sewer line under the concrete slab of the house (not beyond the walls of the house), require replacement due to an active blockage. In addition, approximately 5ft of additional sewer line will be installed to accompany a new kitchen including an island. The kitchen island will have water and electric (dishwasher, outlets) via the trench. Additional outlets will be installed to the walls of the kitchen for appliances and for countertop outlets. Water will also be supplied at the kitchen wall for appliances (i.e. refrigerator). New cabinets will be installed. A new wall will be constructed containing a door frame and outlets.\r\nThe following outlines the work to be done in order:\r\n(1) Create a trench of approximately 30ft in concrete enabling access to existing sewer line and additional trench of approximately 5ft to enable ability to install sewer, water, and electric for new kitchen island. (2) Remove approximately 30ft of existing cast-iron sewer line and replace with PVC, install sewer drain for kitchen island (rough in including island vent), install water lines for kitchen island and for kitchen wall. (3) Route electrical conduit/wire to location of kitchen island (to be connected to panel later) (4) Treat and fill trench as well as repair concrete slab and level floor. (5) Install kitchen outlets for appliances (stove/range, microwave, hood, refrigerator, etc) and for general use. (6) Install kitchen cabinets and install kitchen island outlets for dishwasher, garbage disposal, general use. (7) Install new wall in previously existing frame which is to include outlets and one door frame....B/E/P/M...NOC REQ ON SITE****HOMEOWNER IS SUB ALL TRADES***SUPPLEMENT Addition of bathroom within existing interior. Addition of DWV group under concrete slab, slab repair (including insecticide and vapor), interior non-load bearing walls/doors, above ground electrical and water lines. See permit attachments for revised layout.*****SUPPLEMENT Resizing existing windows to smaller openings with cinder block infill. Creating three window openings where two previously existed, including one opening converted into two smaller windows with block in between. Replacing two windows in existing sizes. Infill of existing sliding glass door with concrete block. A subcontractor is being added for this work. See attachments “Subcontractor Form rev 2025.09.01” and “Window Layout Diagram.”",
"3654 AVOCADO RD, LARGO 33770"
],
"grid_inferred": {
"application_date": "10/23/2023",
"description": "**05/29/2025 Second Renewal** Approximately 30ft of the sewer line under the concrete slab of the house (not beyond the walls of the house), require replacement due to an active blockage. In addition, approximately 5ft of additional sewer line will be installed to accompany a new kitchen including an island. The kitchen island will have water and electric (dishwasher, outlets) via the trench. Additional outlets will be installed to the walls of the kitchen for appliances and for countertop outlets. Water will also be supplied at the kitchen wall for appliances (i.e. refrigerator). New cabinets will be installed. A new wall will be constructed containing a door frame and outlets.\r\nThe following outlines the work to be done in order:\r\n(1) Create a trench of approximately 30ft in concrete enabling access to existing sewer line and additional trench of approximately 5ft to enable ability to install sewer, water, and electric for new kitchen island. (2) Remove approximately 30ft of existing cast-iron sewer line and replace with PVC, install sewer drain for kitchen island (rough in including island vent), install water lines for kitchen island and for kitchen wall. (3) Route electrical conduit/wire to location of kitchen island (to be connected to panel later) (4) Treat and fill trench as well as repair concrete slab and level floor. (5) Install kitchen outlets for appliances (stove/range, microwave, hood, refrigerator, etc) and for general use. (6) Install kitchen cabinets and install kitchen island outlets for dishwasher, garbage disposal, general use. (7) Install new wall in previously existing frame which is to include outlets and one door frame....B/E/P/M...NOC REQ ON SITE****HOMEOWNER IS SUB ALL TRADES***SUPPLEMENT Addition of bathroom within existing interior. Addition of DWV group under concrete slab, slab repair (including insecticide and vapor), interior non-load bearing walls/doors, above ground electrical and water lines. See permit attachments for revised layout.*****SUPPLEMENT Resizing existing windows to smaller openings with cinder block infill. Creating three window openings where two previously existed, including one opening converted into two smaller windows with block in between. Replacing two windows in existing sizes. Infill of existing sliding glass door with concrete block. A subcontractor is being added for this work. See attachments “Subcontractor Form rev 2025.09.01” and “Window Layout Diagram.”",
"record_type": "Residential Remodel/Repair/Renovation",
"site_address": "3654 AVOCADO RD, LARGO 33770",
"status": "Issued"
},
"work_category": "electrical"
},
"source_record_id": "BR-RMR-23-01124",
"source_url": "https://aca-prod.accela.com/PINELLAS/Cap/CapDetail.aspx?Module=Building&TabName=Building&capID1=23CAP&capID2=00000&capID3=012S2&agencyCode=PINELLAS&IsToShowInspection=",
"state": "FL",
"status": "Issued",
"work_date": "2023-10-23",
"work_event_id": "BR-RMR-23-01124",
"work_type": "Residential Remodel/Repair/Renovation",
"work_value": 8000,
"work_value_source": "Pinellas Accela Value of Construction"
}