bluedoor data·Licensed Contractors API·bluedoor.sh ↗

HomeWork eventsInstall 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect...

Install 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect...

Electrical event dated 2025-06-30.

Work event

Work event PKevent_218b37f655f113f95390
Work typeElectrical
Work categoryElectrical
DescriptionInstall 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect. ** SEPERATE GAS PERMIT #BLD202509637 REQUIRED FOR LP TANK ** RECORDED NOC REQUIRED TO BE ON-SITE FOR INSPECTOR FOR INSTALL 26 KW GENERATOR &amp; INSTALL TARNSFER SWITCH IN OR BK: 3579 PG: 2276 ** SITEPLAN WAIVED - GENERATOR LOCATION IS NOT ENCROACHING INTO EASEMENTS AND MEETS SETBACKS **&nbsp;<span style="color: rgba(0, 0, 0, 1); font-family: Helvetica, Arial, sans-serif; font-size: 1em">EROSIONINSPECTIONS ARE CONDUCTED BY ENGINEERING BEFORE ANY GROUND DISTURBANCESRELATIVE TO CONSTRUCTION MAY COMMENCE.&nbsp; PLEASE SUBMIT A REQUEST FOR ANINSPECTION 24 HOURS PRIOR TO THE DESIRED DATE OF INSPECTION VIA THE PERMITPORTAL **&nbsp;</span><p class="MsoNormal"><span style="color: rgba(0, 0, 0, 1)"></span></p>
Work date2025-06-30
StatusFinalized
Source record IDBLD202509437:BAILEY ELECTRIC & SIGNS LLC
JurisdictionCitrus County building permit search portal

Location

Site address-
City-
County-
State-
Postal code-
Parcel ID-
Latitude-
Longitude-

Project value

Amount-
Type-
Source-
Confidence-

Provenance

Source URL-
Raw payload path-
Imported at-

Full work-event record

Work Event PKevent_218b37f655f113f95390
Firm IDfirm_8011d04ed24741ae30b3
Local Identity IDidentity_5cbabf90261693f69630
Portal Keycitrus_permitsearch
Jurisdiction ScopeCitrus County building permit search portal
Source Record IDBLD202509437:BAILEY ELECTRIC & SIGNS LLC
Work Event IDBLD202509437
Work TypeElectrical
Work Categoryelectrical
DescriptionInstall 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect. ** SEPERATE GAS PERMIT #BLD202509637 REQUIRED FOR LP TANK ** RECORDED NOC REQUIRED TO BE ON-SITE FOR INSPECTOR FOR INSTALL 26 KW GENERATOR &amp; INSTALL TARNSFER SWITCH IN OR BK: 3579 PG: 2276 ** SITEPLAN WAIVED - GENERATOR LOCATION IS NOT ENCROACHING INTO EASEMENTS AND MEETS SETBACKS **&nbsp;<span style="color: rgba(0, 0, 0, 1); font-family: Helvetica, Arial, sans-serif; font-size: 1em">EROSIONINSPECTIONS ARE CONDUCTED BY ENGINEERING BEFORE ANY GROUND DISTURBANCESRELATIVE TO CONSTRUCTION MAY COMMENCE.&nbsp; PLEASE SUBMIT A REQUEST FOR ANINSPECTION 24 HOURS PRIOR TO THE DESIRED DATE OF INSPECTION VIA THE PERMITPORTAL **&nbsp;</span><p class="MsoNormal"><span style="color: rgba(0, 0, 0, 1)"></span></p>
Observed Project Value12,095
Value Typedeclared_value
Value SourceCitrus Permit Search Declared Value
Value Confidencehigh
Work Date2025-06-30
StatusFinalized
Site Address5195 W CHIPPEWA DR BEVERLY HILLS, FL 34465
CityW CHIPPEWA DR BEVERLY HILLS
StateFL
Postal Code34465
CountyCitrus
Parcel ID1817320010025400130
Latitude-
Longitude-
Source URLhttps://apps.citrusbocc.com/permitsearch/detail-print.xhtml?apno=BLD202509437
Raw Payload Pathartifacts/business-layer-samples/citrus_permitsearch/run_date=2026-06-05/raw/detail-print-BLD202509437.html
Imported At2026-06-05
Source Fields
{
  "business_display_name": "BAILEY ELECTRIC & SIGNS LLC",
  "city": "W CHIPPEWA DR BEVERLY HILLS",
  "confidence_notes": "Parsed from Citrus County public permitsearch print-detail page. Licensed-contact row is the observed contractor/contact on the public permit record.",
  "county": "Citrus",
  "description": "Install 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect. ** SEPERATE GAS PERMIT #BLD202509637 REQUIRED FOR LP TANK ** RECORDED NOC REQUIRED TO BE ON-SITE FOR INSPECTOR FOR INSTALL 26 KW GENERATOR &amp; INSTALL TARNSFER SWITCH IN OR BK: 3579 PG: 2276 ** SITEPLAN WAIVED - GENERATOR LOCATION IS NOT ENCROACHING INTO EASEMENTS AND MEETS SETBACKS **&nbsp;<span style=\"color: rgba(0, 0, 0, 1); font-family: Helvetica, Arial, sans-serif; font-size: 1em\">EROSIONINSPECTIONS ARE CONDUCTED BY ENGINEERING BEFORE ANY GROUND DISTURBANCESRELATIVE TO CONSTRUCTION MAY COMMENCE.&nbsp; PLEASE SUBMIT A REQUEST FOR ANINSPECTION 24 HOURS PRIOR TO THE DESIRED DATE OF INSPECTION VIA THE PERMITPORTAL **&nbsp;</span><p class=\"MsoNormal\"><span style=\"color: rgba(0, 0, 0, 1)\"></span></p>",
  "email": null,
  "insurance_or_bond_summary": null,
  "jurisdiction_scope": "Citrus County building permit search portal",
  "legal_or_dba_name": "BAILEY ELECTRIC & SIGNS LLC",
  "license_number": null,
  "license_status": null,
  "license_type": "Licensed Contact (Primary)",
  "mailing_or_firm_address": "8255 W CRYSTAL STREET CRYSTAL RIVER, FL 34428",
  "parcel_id": "1817320010025400130",
  "phone": null,
  "portal_key": "citrus_permitsearch",
  "postal_code": "34465",
  "qualifier_name": null,
  "raw_payload_path": "artifacts/business-layer-samples/citrus_permitsearch/run_date=2026-06-05/raw/detail-print-BLD202509437.html",
  "scope_layer": "county_permitting_authority",
  "site_address": "5195 W CHIPPEWA DR BEVERLY HILLS, FL 34465",
  "source_fields": {
    "contact": {
      "Address": "8255 W CRYSTAL STREET CRYSTAL RIVER, FL 34428",
      "Name": "BAILEY ELECTRIC & SIGNS LLC",
      "Type": "Licensed Contact (Primary)"
    },
    "contacts": [
      {
        "Address": "8255 W CRYSTAL STREET CRYSTAL RIVER, FL 34428",
        "Name": "BAILEY ELECTRIC & SIGNS LLC",
        "Type": "Licensed Contact (Primary)"
      }
    ],
    "description": "Install 26 KW generator and 200 amp transfer switch. Install 200 amp outside disconnect. ** SEPERATE GAS PERMIT #BLD202509637 REQUIRED FOR LP TANK ** RECORDED NOC REQUIRED TO BE ON-SITE FOR INSPECTOR FOR INSTALL 26 KW GENERATOR &amp; INSTALL TARNSFER SWITCH IN OR BK: 3579 PG: 2276 ** SITEPLAN WAIVED - GENERATOR LOCATION IS NOT ENCROACHING INTO EASEMENTS AND MEETS SETBACKS **&nbsp;<span style=\"color: rgba(0, 0, 0, 1); font-family: Helvetica, Arial, sans-serif; font-size: 1em\">EROSIONINSPECTIONS ARE CONDUCTED BY ENGINEERING BEFORE ANY GROUND DISTURBANCESRELATIVE TO CONSTRUCTION MAY COMMENCE.&nbsp; PLEASE SUBMIT A REQUEST FOR ANINSPECTION 24 HOURS PRIOR TO THE DESIRED DATE OF INSPECTION VIA THE PERMITPORTAL **&nbsp;</span><p class=\"MsoNormal\"><span style=\"color: rgba(0, 0, 0, 1)\"></span></p>",
    "identification": {
      "Added On": "06-30-2025 01:07 PM",
      "Declared Value": "$12,095.00",
      "Permit Number": "BLD202509437",
      "Type": "Electrical"
    },
    "list_row": {
      "address": "5195 W CHIPPEWA DR BEVERLY HILLS, FL 34465",
      "date_opened": "06-30-2025",
      "href": "https://apps.citrusbocc.com/permitsearch/detail.xhtml?apno=BLD202509437",
      "permit_number": "BLD202509437",
      "status": "Finalized",
      "type": "Electrical"
    },
    "status_dates": {
      "Certified On": "",
      "Expires On": "01-25-2026",
      "Final On": "07-29-2025",
      "Issued On": "07-14-2025"
    }
  },
  "source_record_id": "BLD202509437:BAILEY ELECTRIC & SIGNS LLC",
  "source_url": "https://apps.citrusbocc.com/permitsearch/detail-print.xhtml?apno=BLD202509437",
  "state": "FL",
  "status": "Finalized",
  "work_date": "2025-06-30",
  "work_event_id": "BLD202509437",
  "work_type": "Electrical",
  "work_value": "$12,095.00",
  "work_value_source": "Citrus Permit Search Declared Value"
}
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_218b37f655f113f95390?include_source_fields=trueJSON
Install 26 KW generator and 200 amp transfer switch. Install 200 am... — Licensed Contractors data | bluedoor