Commercial Building event dated 2026-05-18.

Work event

Work event PKevent_0f4df4f0c8b7cf659487
Work typeBuilding Commercial - Alteration / Alteration
Work categoryCommercial Building
DescriptionIn entry and kitchen remove fluorescent lighting, drywall on ceiling, to allow for new ceiling height. Replace fluorescent lighting with LED lighting in entry and kitchen. Remove and replace kitchen sink, faucet and garbage disposal. Remove portion of wall located in hall, adjacent to kitchen to create knee wall. Replace outlets and switches in kitchen and entry to meet current building code. We will be using MC 14-2 wire. Light switches and outlets will be brought up to Fl building code as needed. There will be no increase in lighting loads for installation of LED lighting. In the guest bathroom we will remove the existing tub, tile, shower trim, toilet, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using Schluter-Kerdi sloped shower pan. Install ½” durock and red guard on all surrounding shower walls. Replace shower trim with new Moen or Delta mixing valves, we will install toilet, vanity,sink, faucet vanity light and LED light above shower.In the master bathroom we will remove the existing tile, shower trim, toilet, sink, faucet,fixtures vanity and vanity light. We will install a new shower pan using Schluter-Kerdi sloped shower pan. Install ½”durock and red guard on all surrounding shower walls. Replace shower trim with new Moen or Delta mixing valves, we will install new toilet, vanity, sink, faucet vanity light, 1 LED light above shower and 2 LED lights in bathroom. UL rating is UL263. Per property manager, this is not a post tension building. Level one alteration which includes or removes existing material by covering with new material for the same purpose.
Work date2026-05-18
StatusIssued
Source record IDCP-299811
JurisdictionSt. Lucie County EnerGov Building jurisdiction

Location

Site address-
City-
County-
State-
Postal code-
Parcel ID-
Latitude-
Longitude-

Project value

Amount-
Type-
Source-
Confidence-

Provenance

Source URL-
Raw payload path-
Imported at-

Full work-event record

Work Event PKevent_0f4df4f0c8b7cf659487
Firm IDfirm_436ab97b23f56c222743
Local Identity IDidentity_e0be696f5dc0f072d8f1
Portal Keystlucie_energov
Jurisdiction ScopeSt. Lucie County EnerGov Building jurisdiction
Source Record IDCP-299811
Work Event IDBLDC-2604-004310
Work TypeBuilding Commercial - Alteration / Alteration
Work Categorycommercial_building
DescriptionIn entry and kitchen remove fluorescent lighting, drywall on ceiling, to allow for new ceiling height. Replace fluorescent lighting with LED lighting in entry and kitchen. Remove and replace kitchen sink, faucet and garbage disposal. Remove portion of wall located in hall, adjacent to kitchen to create knee wall. Replace outlets and switches in kitchen and entry to meet current building code. We will be using MC 14-2 wire. Light switches and outlets will be brought up to Fl building code as needed. There will be no increase in lighting loads for installation of LED lighting. In the guest bathroom we will remove the existing tub, tile, shower trim, toilet, sink, faucet, fixtures vanity and vanity light. We will install a new shower pan using Schluter-Kerdi sloped shower pan. Install ½” durock and red guard on all surrounding shower walls. Replace shower trim with new Moen or Delta mixing valves, we will install toilet, vanity,sink, faucet vanity light and LED light above shower.In the master bathroom we will remove the existing tile, shower trim, toilet, sink, faucet,fixtures vanity and vanity light. We will install a new shower pan using Schluter-Kerdi sloped shower pan. Install ½”durock and red guard on all surrounding shower walls. Replace shower trim with new Moen or Delta mixing valves, we will install new toilet, vanity, sink, faucet vanity light, 1 LED light above shower and 2 LED lights in bathroom. UL rating is UL263. Per property manager, this is not a post tension building. Level one alteration which includes or removes existing material by covering with new material for the same purpose.
Observed Project Value62,000
Value Typevaluation
Value SourceSt. Lucie EnerGov ValuationValue
Value Confidencehigh
Work Date2026-05-18
StatusIssued
Site Address10600 Ocean Jensen Beach FL 34957
CityJensen Beach
StateFL
Postal Code34957
CountySt. Lucie
Parcel ID451151700490003
Latitude-
Longitude-
Source URLhttps://stluciecountyfl-energovpub.tylerhost.net/apps/selfservice/api/energov/permits/p...
Raw Payload Pathartifacts/business-backfills/stlucie_energov/run_date=2026-06-03/kw-all_dates-2026-05-16..2026-05-22_field-issue_pages-1-10_size-100_sm-2_fm-2_details-all.json.gz
Imported At2026-06-03
Source Fields
{
  "source_kind": "stlucie_energov_compact",
  "attachments_total": 17,
  "contacts_total": 5,
  "square_feet": 1023,
  "date_field": "issue",
  "work_date_basis": "IssueDate"
}
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/work-events/event_0f4df4f0c8b7cf659487?include_source_fields=trueJSON
In entry and kitchen remove fluorescent lighting, drywall on ceilin... — Licensed Contractors data | bluedoor