| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Add (1) 8'x12' dock extension and (1) 60 square foot dock... | 2026-06-01 | Residential Building / Residential Dock | - | - |
| Extended 4-14-26 (90 days) Remove 1 dock and boat lift an... | 2025-09-15 | Residential Building / Residential Dock W/Boatlift | - | - |
| Construct an 85 feet by 4 feet wide dock extension | 2025-02-18 | Residential Building / Residential Dock | - | - |
| Construct a 260 square foot dock with boat lift | 2025-01-13 | Residential Building / Residential Dock W/Boatlift | - | - |
| 352 Square foot dock with boat lift | 2025-01-07 | Residential Building / Residential Dock W/Boatlift | - | - |
| Construct 260 linear feet of seawall 18 inches waterward ... | 2024-07-16 | Residential Building / Residential Seawall | - | - |
| EXTENDED 2-10-25 (90 DAYS) Construct 185 linear feet of s... | 2024-07-16 | Residential Building / Residential Seawall | - | - |
| Replace existing dock at existing location with the exist... | 2024-04-03 | Residential Building / Residential Dock W/Boatlift | - | - |
| EXTENDED 10-22-24 (90 DAYS) Construct 100 linear feet of ... | 2024-01-30 | Residential Building / Residential Seawall | - | - |
| Construct 2 docks 120 square feet total of 240 square fee... | 2023-08-16 | Residential Building / Residential Dock W/Boatlift | - | - |
| Install boatlift at existing slip #5-8 at palm cove marin... | 2023-06-28 | Commercial Building / Commercial Boatlift | - | - |
| Install 4 pilings and one boatlift at existing boatlift | 2023-06-20 | Commercial Building / Commercial Boatlift | - | - |
| construct 180 linear feet of seawall 18 inches waterward ... | 2023-03-08 | Residential Building / Residential Seawall | - | - |
| Install 4 pilings and one boatlift at existing boatlift | 2023-01-23 | Residential Building / Residential Boatlift | - | - |
| RENEWED 3-22-23 (180 DAYS) Install 8 pilings and 1 boatlift | 2022-08-15 | Residential Building / Residential Boatlift | - | - |
| construct a 3x25 finger pier with a boat lift & pilings a... | 2022-03-11 | Residential Building / Residential Boatlift | - | - |
| Construct 134 linear feet of seawall 18 inches waterward ... | 2021-11-08 | Residential Building / Residential Seawall | - | - |
| CONSTRUCT 75 LINEAR FEET OF SEAWALL 18 INCHES WATERWARD O... | 2020-09-09 | Residential Building / Residential Seawall | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_f1f9d93495b62b9f0409/work-events?limit=50JSON