Home › Contractors › contractor firm_f097b16d056dbe7afdfe › Work events
Work events
Permits and public work events attributed to this contractor. Showing 5 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| after the fact permit accessory structure | 2026-05-20 | Aluminum Structure | - | - |
| Re Roof Tear Off Existing and Replace with Metal | 2026-01-26 | Roofing / Replacement Metal, Clay Tile, Concrete / Re Roof Tear Off Existing and Replace with Metal | - | - |
| Remodel Building Up to commercial standards | 2025-07-21 | Commercial Building / Alteration/Remodel / Remodel Building Up to commercial standards | - | - |
| Remove old drywall/Remove old ceiling paneling/ remove ol... | 2025-07-18 | Hvac / Demolition / Remove old drywall/Remove old ceiling paneling/ remove old ac ducting. Basically strip building down to rough in stage so new trades can come in and run new electrical/plumbing/hvac once new commercial building permit is approved | - | - |
| Installing new apron for parking lot | 2025-02-11 | Utility / Installing new apron for parking lot | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_f097b16d056dbe7afdfe/work-events?limit=50JSON