Home › Contractors › contractor firm_e4b8b8a13f6427c4b514 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 4 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| notification of existing bathroom to ADA requirement. | 2023-10-05 | notification of existing bathroom to ADA requirement. | - | - |
| interior repair form hurricane for units 7 and 8 | 2023-08-16 | interior repair form hurricane for units 7 and 8 | - | - |
| Perform a comprehensive cleaning and replacement of the r... | 2023-08-15 | Hvac / Perform a comprehensive cleaning and replacement of the reflective ceiling system. apply ceiling insulation, Adjust the low-voltage wiring above the grid line accordingly. Address minor electrical adjustments if required. Additionally, execute slight mechanical duct adjustments. Complete any essential drywall repairs, followed by the final step of painting the area. Note that no structural components of the internal system need to be addressed | - | - |
| replacement of the reflective ceiling system. Adjust the ... | 2023-08-07 | Hvac / replacement of the reflective ceiling system. Adjust the low-voltage wiring above the grid line, minor electrical and mechanical duct adjustments, drywall repairs | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_e4b8b8a13f6427c4b514/work-events?limit=50JSON