Home › Contractors › contractor firm_bae6ccd51662c1c1f2f7 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 10 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| REMOVE AND REPLACE/REPAIR DOCK DUE TO HURRICANE DAMAGE. P... | 2026-06-04 | Res Accessory Permit (Dock, Replacement) | - | - |
| REMOVE AND REPLACE/REPAIR DOCK DUE TO HURRICANE DAMAGE. P... | 2026-06-04 | Residential Building / Wetland Alteration Permit (Residential, Building Permit) | - | - |
| Manatee Mitigation (Residential, Building Permit) | 2026-06-04 | Residential Building / Manatee Mitigation (Residential, Building Permit) | - | - |
| REMOVE EXISTING DOCK ON PROPERTY AND BUILD NEW WALKWAY AN... | 2026-06-04 | Residential Building / Wetland Alteration Permit (Residential, Building Permit) | - | - |
| REMOVE EXISTING DOCK ON PROPERTY AND BUILD NEW WALKWAY AN... | 2026-06-04 | Res Accessory Permit (Boathouse, New Work) | - | - |
| Holly Hill: Dock replacement, there was an existing dock ... | 2025-05-20 | Residential Building / Manatee Mitigation (Residential, Standalone) | - | - |
| D.B. -New boat house and platform with rope railings arou... | 2025-05-20 | Residential Building / Manatee Mitigation (Residential, Standalone) | - | - |
| D.B. -New boat house and platform with rope railings arou... | 2025-05-20 | Residential Building / Manatee Mitigation (Residential, Standalone) | - | - |
| new walkway with platform no boat mooring | 2024-01-11 | Residential Building / Manatee Mitigation (Residential, Standalone) | - | - |
| new dock with boathouse and upper deck | 2023-10-18 | Residential Building / Manatee Mitigation (Residential, Standalone) | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_bae6ccd51662c1c1f2f7/work-events?limit=50JSON