Home › Contractors › contractor firm_90259a1496ec8890fcc5 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 3 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Delete alcove bathtub and water closet. Rough in 2 alcove... | 2023-10-04 | Delete alcove bathtub and water closet. Rough in 2 alcove bathtubs, 2 tub/shower valves and 2 water closets. 2 lavatories, like for like. Install trim fixtures. | - | - |
| Replace drop in roman tub with freestanding tub, rough in... | 2023-09-13 | Replace drop in roman tub with freestanding tub, rough in new drain location. Rough in wall mount tub filler. Rough in shower valve at new location. New shower drain. Trim shower and tub, install lavatory faucet and toilet-like for like. | - | - |
| Rebuild 2 showers, like for like. New rough in valves and... | 2023-07-27 | Rebuild 2 showers, like for like. New rough in valves and trim. | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_90259a1496ec8890fcc5/work-events?limit=50JSON