Home › Contractors › contractor firm_81aeb7e59146058e19de › Work events
Work events
Permits and public work events attributed to this contractor. Showing 21 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| CORRUGATED SEAWALL IN FRONT OF EXISTING | 2023-09-25 | CORRUGATED SEAWALL IN FRONT OF EXISTING | - | - |
| NEW DOCK W/ FUTURE LIFT PILINGS | 2023-08-28 | NEW DOCK W/ FUTURE LIFT PILINGS | - | - |
| BUILD A NEW 361 SQ FT DOCK ON EXISTING PILINGS | 2023-08-11 | BUILD A NEW 361 SQ FT DOCK ON EXISTING PILINGS | - | - |
| BUILD NEW APPROX. 252 DOCK & RE-FRAME RE-DECK APPROX. 88,... | 2023-08-08 | BUILD NEW APPROX. 252 DOCK & RE-FRAME RE-DECK APPROX. 88, RE-INSTALL OWNER LIFT. | - | - |
| RE-FRAME AND RE-DECK APPROX. 902 SQ FT, REPLACE3 LIFT PIL... | 2023-08-02 | RE-FRAME AND RE-DECK APPROX. 902 SQ FT, REPLACE3 LIFT PILING, RE-INSTALL OWNER LIFT. | - | - |
| Closed-Revision Approved | 2023-08-01 | Closed-Revision Approved | - | - |
| BUILD A NEW APPROX. 400 SQ FT WOOD DOCK W/ NEW LIFT | 2023-07-24 | BUILD A NEW APPROX. 400 SQ FT WOOD DOCK W/ NEW LIFT | - | - |
| ADD APPROX. 256 SQ FT WOOD DOCK SECTION AND NEW 10K BOAT ... | 2023-07-19 | ADD APPROX. 256 SQ FT WOOD DOCK SECTION AND NEW 10K BOAT LIFT | - | - |
| APPRXO. 482 SQ FT DOCK ADDITION, NEW 20K LIFT | 2023-07-17 | APPRXO. 482 SQ FT DOCK ADDITION, NEW 20K LIFT | - | - |
| REPLACE (2) OUTSIDE LIFT PILINGS | 2023-07-17 | REPLACE (2) OUTSIDE LIFT PILINGS | - | - |
| ePlan | 2023-07-07 | Roofing / REPLACE BOAT HOUSE ROOF - DESTROYED IN STORM | - | - |
| BUILD A NEW APPROX. 138 SQ FT DOCK W/ 12K - RE-INSTALL OW... | 2023-06-30 | BUILD A NEW APPROX. 138 SQ FT DOCK W/ 12K - RE-INSTALL OWNER LIFT | - | - |
| RE-BUILD 343 SQ FT - NEW PILINGS & NEW 14K LIFT - RE-FRAM... | 2023-06-30 | RE-BUILD 343 SQ FT - NEW PILINGS & NEW 14K LIFT - RE-FRAME/RE-DECK 236 SQ FT | - | - |
| BUILD NEW APPROX. 90 SQ FT DOCK | 2023-06-30 | BUILD NEW APPROX. 90 SQ FT DOCK | - | - |
| INSTALL NEW 7K LIFT | 2023-06-30 | INSTALL NEW 7K LIFT | - | - |
| REPLACE VARIOUS PILINGS | 2023-06-29 | REPLACE VARIOUS PILINGS | - | - |
| RE-BUILD DOCK ON EXISTING PILING | 2023-06-29 | RE-BUILD DOCK ON EXISTING PILING | - | - |
| NEW 185 SQ FT WOOD DOCK | 2023-06-29 | NEW 185 SQ FT WOOD DOCK | - | - |
| WOOD DOCK & BOAT LIFT | 2023-06-29 | WOOD DOCK & BOAT LIFT | - | - |
| RE-BUILD APPROX 380 SQ. FT. WOOD DOCK & INSTALL 2 LIFTS | 2023-06-20 | RE-BUILD APPROX 380 SQ. FT. WOOD DOCK & INSTALL 2 LIFTS | - | - |
| RE-BUILD DOCK & LIFT | 2023-06-09 | RE-BUILD DOCK & LIFT | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_81aeb7e59146058e19de/work-events?limit=50JSON