Home › Contractors › contractor firm_732ebb22c9dd3f50457b › Work events
Work events
Permits and public work events attributed to this contractor. Showing 17 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Replace existing Notifier 5000 and Simplex 4001 FACPs due... | 2023-09-22 | Replace existing Notifier 5000 and Simplex 4001 FACPs due to failure and manufacture discontinuation. Replacement fire alarm control panel will be a Siemens FV 922 addressable voice system. | - | - |
| INSTALLING PIV TAMPER SWITCH | 2023-06-28 | INSTALLING PIV TAMPER SWITCH | - | - |
| INSTALL PIV TAMPER SWITCH | 2023-06-28 | INSTALL PIV TAMPER SWITCH | - | - |
| INSTALL PIV TAMPER SWITCH | 2023-06-28 | INSTALL PIV TAMPER SWITCH | - | - |
| Install PIV tamper switch | 2023-06-26 | Install PIV tamper switch | - | - |
| Install PIV tamper switch | 2023-06-26 | Install PIV tamper switch | - | - |
| Install PIV tamper switch | 2023-06-26 | Install PIV tamper switch | - | - |
| *RPI01 - Control panel type changed in reference to monit... | 2023-06-26 | *RPI01 - Control panel type changed in reference to monitoring takeover. REF. Permit Number FIR2021-01697. Monitoring will be provided on new Siemens addressable fire alarm control panel upon installation* | - | - |
| Install PV tamper switch | 2023-06-26 | Install PV tamper switch | - | - |
| Install PIV tamper switch | 2023-06-26 | Install PIV tamper switch | - | - |
| Install PIV tamper switch per AHJ | 2023-06-25 | Install PIV tamper switch per AHJ | - | - |
| Install PIV tamper switch per AHJ | 2023-06-25 | Install PIV tamper switch per AHJ | - | - |
| Install PIV tamper switch per AHJ | 2023-06-25 | Install PIV tamper switch per AHJ | - | - |
| Install PIV tamper switch perm AHJ | 2023-06-25 | Install PIV tamper switch perm AHJ | - | - |
| Revision - Install PIV Tamper Switch | 2023-06-07 | Revision - Install PIV Tamper Switch | - | - |
| Revision - Install PIV Tamper Switch per AHJ | 2023-06-07 | Revision - Install PIV Tamper Switch per AHJ | - | - |
| Revision - Install PIV Tamper Switch per AHJ | 2023-06-07 | Revision - Install PIV Tamper Switch per AHJ | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_732ebb22c9dd3f50457b/work-events?limit=50JSON