Home › Contractors › contractor firm_6e774b9d5d0c74118aaa › Work events
Work events
Permits and public work events attributed to this contractor. Showing 22 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Replace 100A main lug panel with new panel and breakers | 2024-06-11 | Electrical / Residential Trade Electrical | - | - |
| EXTENDED 12-19-24 (90 DAYS) Replace 100A main lug panel w... | 2024-06-11 | Electrical / Commercial Electrical | - | - |
| Install new 24KW Generac generator with a 200A ATS | 2024-03-13 | Residential Building / Residential Generator | - | - |
| 60A feed from metermain to shed 60A subpanel Receptacles ... | 2023-12-10 | Electrical / Residential Trade Electrical | - | - |
| Replace defective hundred amp main lug GE panel with new ... | 2023-11-14 | Electrical / Residential Trade Electrical | - | - |
| Replace defective hundred amp main lug GE panel with new ... | 2023-11-14 | Electrical / Commercial Electrical | - | - |
| New 24KW Generac Generator with 200A ATS | 2023-05-22 | Residential Building / Residential Generator | - | - |
| Installing new 200 amp meter main service to new metal bu... | 2022-02-15 | Electrical / Residential Trade Electrical | - | - |
| removal of paneling , replace wood. | 2021-09-21 | Residential Building / Residential Remodel | - | - |
| Install 22KW generator with 2 150A ATS | 2021-05-28 | Residential Building / Residential Generator | - | - |
| Install 22KW propane generator | 2021-03-22 | Residential Building / Residential Generator | - | - |
| Replaced Challenger 200A disconnect and garage panel with... | 2020-12-28 | Electrical / Residential Trade Electrical | - | - |
| Replace Challenger panel in garage with new Square D | 2020-07-23 | Electrical / Residential Trade Electrical | - | - |
| Install 22KW automatic standby generator | 2020-06-03 | Residential Building / Residential Generator | - | - |
| Install generator | 2020-05-21 | Residential Building / Residential Generator | - | - |
| PERMIT RENEWED 12-2-20 (6 MONTHS) Replace 200A metercan a... | 2020-04-13 | Electrical / Residential Trade Electrical | - | - |
| EMERGENCY REPLACEMENT OF 100A FPE PANEL | 2018-09-05 | Electrical / Commercial Electrical | - | - |
| Installation of 22KW propane generator with 200A service ... | 2018-04-01 | Residential Building / Residential Generator | - | - |
| replace old 100 a main lug panel | 2016-09-07 | Electrical / Commercial Electrical | - | - |
| PERMIT RENEWED 8-16-16 (6 MONTH RENEWAL) installing 16000... | 2015-09-09 | Residential Building / Residential Boatlift | - | - |
| Installing new 200 a meter main & 2' riser with new 150A ... | 2013-06-07 | Electrical / Residential Trade Electrical | - | - |
| removing 4 200 amp disconnects for suites ABCD-replacing ... | 2012-11-06 | Electrical / Commercial Electrical | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_6e774b9d5d0c74118aaa/work-events?limit=50JSON