| running new gas from the manifold in the attic to the new... | 2026-06-02 | Windows Doors / Gas Line / running new gas from the manifold in the attic to the new outdoor grill on the back porch--gas line will be in CSST piping on 1/2 PSI --max load 40,000 BTUs | - | - |
| New Residential Construction | 2026-06-01 | Residential Building / New Residential Construction | - | - |
| run gas line from existing meter to new pool heater | 2026-05-14 | Pool / Gas Line / run gas line from existing meter to new pool heater | - | - |
| run hot and cold water from water heater up into attic, t... | 2026-05-01 | Miscellaneous / run hot and cold water from water heater up into attic, then across approx 10 ft down to supply new lav and toilet, run drain for lav in wall over to toilet pump, run ven up into attic and tie into existing vent--run discharge line from toilet pump tank up into attic--install macerating toilet and vanity with vent and discharge overhead | - | - |
| run underground gas piping from meter to pool heater | 2026-03-20 | Pool / Gas Line / run underground gas piping from meter to pool heater | - | - |
| running new 3/4 in csst 2 psi gas line from meter to pool... | 2026-03-10 | Pool / Gas Line / running new 3/4 in csst 2 psi gas line from meter to pool heater across and strapped to block wall gas line is roughly 12 ft max load 400,000 btus | - | - |
| run a gas line from existing natural gas line at the mani... | 2026-03-09 | Gas Line / run a gas line from existing natural gas line at the manifold in attic to a future grill and fireplace | - | - |
| running new 3/4 in CSST 2 psi gas line from the meter to ... | 2026-02-26 | Gas Line / running new 3/4 in CSST 2 psi gas line from the meter to the tankless water heater, then down the block wall with tee's, ball valves and caps for future dryer, cook top, wall oven and bbq grill--gas line after tankless water heater will be 3/4 in csst on 1/2 psi | - | - |
| bury a 1000 gallon LP tank with underground piping to bui... | 2026-02-26 | Gas Line / bury a 1000 gallon LP tank with underground piping to building | - | - |
| need a new permit to schedule a final plumbing inspection... | 2026-02-18 | Plumbing / Miscellaneous / need a new permit to schedule a final plumbing inspection for expired permit PL2021-00220 with the goal to close out the expired permit--building is being sold and they need the permit to be closed out | - | - |
| to run new gas line from existing natural gas meter to ne... | 2026-02-17 | Pool / Gas Line / to run new gas line from existing natural gas meter to new gas pool heater | - | - |
| run gas piping through attic from manifold to pool heater | 2026-02-02 | Pool / Gas Line / run gas piping through attic from manifold to pool heater | - | - |
| tee off of existing manifold in attic and run new gas lin... | 2026-01-14 | Gas Line / tee off of existing manifold in attic and run new gas line (CSST) to future grill | - | - |
| to run 1/2 in gas line from the manifold in attic to new ... | 2025-12-31 | Gas Line / to run 1/2 in gas line from the manifold in attic to new grill location--left side of home approx 55 feet | - | - |
| run 1 in gas line undergroundto generator approx 130ft fr... | 2025-12-12 | Commercial Building / Gas Line / run 1 in gas line undergroundto generator approx 130ft from gas meter to a tankless water heater with galvanized piping then 120 ft of 3/4 in piping underground from gas meter to the laundry building then up the wall and across the side of the building with 3/4 in piping to the tankless water heater then across the back of the building to a commercial dryer | - | - |