Permits and public work events attributed to this contractor. Showing 50 rows on page 1.

Work eventDateCategory / typeCountyValue
Solar PV Roof Installation Utility: KUA2023-12-14Building Permit--
Solar PV Roof Installation Utility: OUC2023-12-04Building Permit--
PV Solar Roof Installation REPLACED BY P26-0000012023-11-28Building Permit--
Solar PV Roof Installation Utility: Duke2023-11-06Building Permit--
Solar PV Roof Installation Utility: Duke2023-10-30Building Permit--
RE - ROOF SOLAR PV - **PRIVATE PROVIDER** - GOLDEN - 10/2...2023-10-25Roofing / Rooftop PV Solar **PRIVATE PROVIDER REVIEW AND INSPECTIONS**B/E...NOC REQ ON SITE--
PV Solar Roof Installation2023-10-25Building Permit--
Solar PV Roof Installation Utility: Duke2023-10-24Building Permit--
Solar PV Roof Installation Utility: KUA2023-10-19Building Permit--
PV solar roof installation OUC2023-10-17Building Permit--
Add 150A main breaker to the interior panel to protect th...2023-10-17Electrical / Electrical Permit--
RE - ROOF SOLAR PV - **PRIVATE PROVIDER** - HASSAN - 10/1...2023-10-12Roofing / Rooftop PV Solar **PRIVATE PROVIDER REVIEW AND INSPECTIONS**NOC REQ ON JOB SITE...REVISION Layout change--
Adding Tesla Powerwall Battery2023-09-29Electrical / Electrical Permit--
PV solar roof installation Duke2023-09-26Building Permit--
Solar PV Roof Installation Utility: Duke2023-09-26Building Permit--
ePlan2023-09-25Roofing / Rooftop PV Solar *Plan Review & Inspections Done By Private Provider – Inspected.com*--
*R01 - Changed layout see sheet C1, C2 and S1. Changed ir...2023-09-22*R01 - Changed layout see sheet C1, C2 and S1. Changed irradiance and 3d render, see sheet C1*--
residential generator addition to PV solar system HC-BTR-...2023-09-18Electrical / Residential Electrical Trade Permit--
Solar PV Roof Installation Utilities: Duke2023-09-15Building Permit--
Solar PV Roof Installation Utility: Duke2023-09-01Building Permit--
Private Provider Inspections- ROOFTOP PV SOLAR2023-09-01Electrical / Residential Electrical Trade Permit--
PV solar ground mount Installation Duke2023-08-25Building Permit--
PV solar roof installation- Install 150A main breaker to ...2023-08-25Building Permit--
Private Provider Inspections- ROOFTOP PV SOLAR2023-08-24Electrical / Residential Electrical Trade Permit--
Solar PV Roof Installation - adding to an existing system...2023-08-18Building Permit--
Private Provider Inspections- ROOFTOP PV SOLAR2023-08-11Electrical / Residential Electrical Trade Permit--
ELEC TRADE | ROOF PHONTOVOLTAIC SYSTEM INSTALLATION2023-08-11Electrical / Residential Electrical Trade Permit--
Private Provider Inspections- Private Provider Inspection...2023-08-08Electrical / Residential Electrical Trade Permit--
Solar PV Roof Installation Utility: Duke2023-08-08Building Permit--
Solar PV Roof Installation Utility: KUA2023-08-03Building Permit--
Solar PV Roof Installation Utility: KUA2023-07-31Building Permit--
Closed-Revision Approved2023-07-27Closed-Revision Approved--
Solar PV Roof Installation Utility: KUA2023-07-27Building Permit--
Solar PV Roof Installation Main Panel Derated to 175A fro...2023-07-26Building Permit--
Solar PV Roof Installation Utility: Duke2023-07-25Building Permit--
PV solar roof installation2023-07-24Building Permit--
Method of interconnection changed from breaker tie in to ...2023-07-19Method of interconnection changed from breaker tie in to supply side tap--
PV Solar roof installation2023-07-17Building Permit--
PV solar roof installation KUA2023-07-14Building Permit--
Rooftop PV Solar2023-07-14Electrical / Residential Electrical Trade Permit--
Solar PV Roof Installation Utility: Duke2023-07-13Building Permit--
RCVD NTBO - INSPECTED.COM PV solar roof installation - SF...2023-07-12Building Permit--
RCVD NTBO - INSPECTED.COM PV Solar roof installation2023-07-12Building Permit--
Closed-Revision Approved2023-07-11Closed-Revision Approved--
Solar PV Roof Installation Utility: OUC2023-07-11Building Permit--
One line riser diagram, Sheet title: E-12023-07-06One line riser diagram, Sheet title: E-1--
PV solar roof installation KUA2023-06-27Building Permit--
Closed-Withdrawn2023-06-26Roofing / Rooftop PV Solar *Plan Review & Inspections Done By Private Provider – Inspected.com*--
RCVD NTBO - INSPECTED.COM PV solar roof installation Duke2023-06-21Building Permit--
Solar PV Roof Installation Utility: OUC2023-06-21Building Permit--
Get this page with API

Rendered from the bluedoor Licensed Contractors API. Reproduce it:

GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_5e467e9a54cd5fff5e9d/work-events?limit=50JSON