Home › Contractors › contractor firm_5bcb106f74b17fdd6418 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 4 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Existing dock is to be replaced in the existing footprint. | 2023-09-06 | Existing dock is to be replaced in the existing footprint. | - | - |
| Hurricane damaged dock is to be rebuilt in existing foot ... | 2023-08-02 | Hurricane damaged dock is to be rebuilt in existing foot print. Existing boat slips are to remain. | - | - |
| Storm damaged dock is to be rebuilt in existing layout. 2... | 2023-08-02 | Electrical / Storm damaged dock is to be rebuilt in existing layout. 20,000# boat lift is to be installed. Electrical is not to be done by Lee Marine. | - | - |
| Existing dock is to rebuilt in he same footprint. | 2023-08-02 | Existing dock is to rebuilt in he same footprint. | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_5bcb106f74b17fdd6418/work-events?limit=50JSON