| Application for a construction trailer permit for the dur... | 2026-05-19 | Building Permit | - | - |
| Fence around treatment facility. SDP25-0154 | 2026-05-07 | Building Permit | - | - |
| Backup power supply for the water treatment process in th... | 2026-05-07 | Building Permit | - | - |
| Tank that receives and holds the backwash water used to c... | 2026-05-06 | Building Permit | - | - |
| Pump station that sends water to the BEQ.-SDP25-0154 | 2026-05-06 | Building Permit | - | - |
| Building housing electrical gear and equipment to power a... | 2026-05-06 | Building Permit | - | - |
| Pump station which all drain lines empty into, it then pu... | 2026-05-06 | Building Permit | - | - |
| Effluent pump station that distributes treated reclaimed ... | 2026-05-06 | Building Permit | - | - |
| Structure that houses tanks holding sodium hypochlorite c... | 2026-05-06 | Building Permit | - | - |
| Water flows into this tank and is injected with chlorine ... | 2026-05-06 | Building Permit | - | - |
| Tanks and pumps that hold water and then send it to the c... | 2026-05-06 | Building Permit | - | - |
| Storage tank for treated reclaimed water. | 2026-05-06 | Building Permit | - | - |
| Structure that houses tanks holding coagulant chemical wh... | 2026-05-06 | Building Permit | - | - |
| A temporary construction office trailer. | 2026-04-15 | Building Permit | - | - |
| Involves the demolition of the existing structure on the ... | 2026-04-07 | Building Permit | - | - |
| Water Treatment Facility - ADMIN AND OPERATIONS BUILDING-... | 2026-03-26 | Building Permit | - | - |
| Temp. Construction Trailer for the WTF site. ADR26-0300 | 2026-03-23 | Building Permit | - | - |
| Construction Trailer for the RIPS site. ADR26-0032 | 2026-02-05 | Building Permit | - | - |
| Surface water pump station facilitating the controlled tr... | 2026-01-27 | Building Permit | - | - |
| RIPS site includes a pump station pulling water from the ... | 2026-01-27 | Building Permit | - | - |
| Addition of Gypsum walls to create offices on the existin... | 2026-01-14 | Building Permit | - | - |
| Demolish existing service center and construct an approxi... | 2025-12-19 | Building Permit | - | - |
| REPLACEMENT OF BLOWERS AND BLOWER YARD PIPING FROM THE BL... | 2025-10-23 | Building Permit | - | - |
| New Electrical Service and Pole Lighting around the prope... | 2025-09-29 | Electrical / Electrical Permit | - | - |
| Temporary Office Trailer for at Wastewater Treatment Plan... | 2025-09-19 | Building Permit | - | - |
| Quick Permit - Installation of (6) receptacles, (6) light... | 2025-09-17 | Electrical / Electrical Permit | - | - |
| Construction of a new Booster pump and Sand filter system... | 2025-09-04 | Building Permit | - | - |
| Construction of a concrete pad and pre-engineered metal b... | 2025-09-04 | Building Permit | - | - |
| Upgrade of generator and electrical system located at wel... | 2025-09-04 | Building Permit | - | - |
| Construction of new concrete pad for the Degasifier/Odor ... | 2025-09-04 | Building Permit | - | - |
| Installation of a New 0.5 MG Ground Storage Tank. With Fi... | 2025-09-04 | Building Permit | - | - |
| Construction of a new nanofiltration facility. With the i... | 2025-09-04 | Building Permit | - | - |
| Installation of a packaged sanitary lift station to handl... | 2025-09-04 | Building Permit | - | - |
| Construction of a new concrete slab and pre-engineered me... | 2025-09-04 | Building Permit | - | - |
| Construction of a new Finished Water Quality Monitoring S... | 2025-09-04 | Building Permit | - | - |
| Construction of a new Enclosed Concentrate Holding Tank, ... | 2025-09-04 | Building Permit | - | - |
| Upgrade of generator and electrical system located at wel... | 2025-09-02 | Commercial Building / Commercial Master File | - | - |
| Construction of new facilities and expansion of existing ... | 2025-09-02 | Commercial Building / Commercial Master File | - | - |
| Adjusting existing walls to create a new single office fo... | 2025-08-14 | Building Permit | - | - |
| Construct interior alterations to existing office space o... | 2025-07-15 | Building Permit | - | - |
| Interior renovation and buildout of shell space on the se... | 2025-06-01 | Building Permit | - | - |
| Addition of CMU walls and gypsum board ceiling to create ... | 2024-10-03 | Building Permit | - | - |
| COSTRUCTION OF A NEW 4 BAY FIRE STATION OFFICES , LIVING ... | 2024-10-01 | Building Permit | - | - |
| Interior renovations to the first floor of the NeoCity of... | 2024-07-10 | Building Permit | - | - |
| Early Foundation Permit for Auger Cast Piles at two new C... | 2023-10-02 | Commercial Building / Commercial Miscellaneous Permit | - | - |
| Expansion of an existing Wastewater Treatment Facility in... | 2023-08-08 | Commercial Building / Commercial Miscellaneous Permit | - | - |
| Foundation Permit for installation of new Auger Cast Pile... | 2023-06-21 | Commercial Building / Commercial Miscellaneous Permit | - | - |
| Tilt wall Monument sign for building under permit# P22-00... | 2022-07-26 | Building Permit | - | - |
| Tilt wall dumpster enclosure for building that has alread... | 2022-07-26 | Building Permit | - | - |
| Tilt wall mechanical enclosure for building permit P22-1463 | 2022-07-26 | Building Permit | - | - |