Home › Contractors › contractor firm_44e62fb60b97cf1f9fbb › Work events
Work events
Permits and public work events attributed to this contractor. Showing 7 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Installation tankless water heater | 2025-06-05 | Plumbing / Residential Trade Plumbing | - | - |
| Install water line from meter to back right side of house... | 2025-03-28 | Plumbing / Residential Trade Plumbing | - | - |
| Installation 500lb propane tank w/ installation of gas line | 2024-03-08 | Residential Building / Residential Gas Tanks | - | - |
| Replacement 3/4 transition riser | 2022-03-03 | Residential Building / Residential Gas Line Installation | - | - |
| Install flexible gas line from existing line in attic dow... | 2020-06-17 | Residential Building / Residential Gas Line Installation | - | - |
| Re-route main water line | 2018-06-20 | Plumbing / Residential Trade Plumbing | - | - |
| Installation gas line from pool heater to gas grill | 2018-03-27 | Residential Building / Residential Gas Line Installation | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_44e62fb60b97cf1f9fbb/work-events?limit=50JSON