Replace over head riser 200A, install 200 amp meter main combo, install new ground system, install feeder from feeder panel tiebreaker panel inside off the house, install new breaker panel inside
Remove old riser with 2 gang meter from LCEC pole. Install H frame structure with single meters and single disconnects 150 AMP disconnects and properly ground equipment
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_402206b1c9a993e41609?include=local_identities,licenses,recent_work_events,complaintsJSON