| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| Replace ex Kidde FX-10R that is damaged and no longer fun... | 2026-04-29 | Electrical / Electric Permit | - | - |
| RELATED TO FAL25-0299 | 2025-10-03 | Electrical / Electrical Permit | - | - |
| RELATED TO FAL25-0275 | 2025-09-23 | Electrical / Electrical Permit | - | - |
| Quick Permit - WAFS to install (1) power supply and (2) n... | 2024-11-20 | Electrical / Electrical Permit | - | - |
| Quick Permit - Relocate (1) and demo (1) notification dev... | 2024-11-19 | Electrical / Electrical Permit | - | - |
| Quick Permit - Demo, replace add and or relocate notifica... | 2024-11-12 | Electrical / Electrical Permit | - | - |
| FAL24-0259 | 2024-07-29 | Electrical / Electrical Permit | - | - |
| FAL24-0260 | 2024-07-29 | Electrical / Electrical Permit | - | - |
| FAL24-0258; | 2024-07-29 | Electrical / Electrical Permit | - | - |
| FAL24-0257 | 2024-07-29 | Electrical / Electrical Permit | - | - |
| FAL24-0249 | 2024-07-12 | Electrical / Electrical Permit | - | - |
| FAL24-0245 | 2024-07-11 | Electrical / Electrical Permit | - | - |
| monitoring takeover via starlink cellular | 2023-10-16 | monitoring takeover via starlink cellular | - | - |
| replace FACP (direct panel replacement) | 2023-09-29 | replace FACP (direct panel replacement) | - | - |
| Connect 3 big fans to the FA system to monitor them for s... | 2023-09-28 | Connect 3 big fans to the FA system to monitor them for shutdown. Reloacte FACU and smoke detector within the same room. Relocate horn strobe in a corridor as shown in a floor plan | - | - |
| Plan revision to architectural - Floor plan changes, elev... | 2023-09-13 | Plan Revision (Building, LAL, ROW) | - | - |
| BLDG 5 - Plan revision to architectural - Floor plan chan... | 2023-09-13 | Plan Revision (Building, LAL, ROW) | - | - |
| Plan revision to architectural - Floor plan changes, elev... | 2023-09-13 | Plan Revision (Building, LAL, ROW) | - | - |
| Revision - Replace the originally proposed AES with a Sta... | 2023-08-31 | Revision - Replace the originally proposed AES with a Starlink cellular communicator. New monitoring contract | - | - |
| monitoring takeover via cellular communicator | 2023-08-23 | monitoring takeover via cellular communicator | - | - |
| replace facp | 2023-08-18 | replace facp | - | - |
| Replace FACP | 2023-08-07 | Replace FACP | - | - |
| replace facp | 2023-07-31 | replace facp | - | - |
| replace facp | 2023-07-11 | replace facp | - | - |
| monitoring takeover | 2023-07-10 | monitoring takeover | - | - |
| monitoring takeover | 2023-07-03 | monitoring takeover | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_31585fe343891ab9d6d1/work-events?limit=50JSON