Home › Contractors › contractor firm_042513def2dc71066c41 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 50 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| ePlan | 2026-06-02 | Pool / Pool Enclosure *Deck done by others* Pool permit POL2026-00376 | - | - |
| ePlan | 2023-10-11 | Pool / Pool Enclosure | - | - |
| 12x12 strip footing | 2023-10-09 | 12x12 strip footing | - | - |
| ePlan | 2023-10-02 | Pool / Install 48' in aluminum pool rail | - | - |
| ePlan | 2023-09-29 | Pool / Pool Enclosure | - | - |
| ePlan | 2023-09-27 | Roofing / Car Port with composite roof | - | - |
| Closed-Revision Approved | 2023-09-27 | Roofing / Changed cage design with 3" composite roof | - | - |
| ePlan | 2023-09-26 | Pool / Pool Enclosure | - | - |
| ePlan | 2023-09-19 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-09-19 | Pool / Pool enclosure *Inspections Done By Private Provider-eAtlantic Engineering* | - | - |
| Closed-Revision Approved | 2023-09-17 | Windows Doors / Changed cage design to include picture window | - | - |
| ePlan | 2023-09-05 | Pool / Pool Rail | - | - |
| ePlan | 2023-09-01 | Pool / Pool Enclosure | - | - |
| Closed-Withdrawn | 2023-09-01 | Pool / New pool enclosure *deck done by pool contractor* | - | - |
| ePlan | 2023-08-14 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-08-09 | Pool / Pool Enclosure ***Revision*** design change to include picture window | - | - |
| ePlan | 2023-08-08 | Pool / 4ft aluminum open picket, pool code W/ gates | - | - |
| ePlan | 2023-08-08 | Pool / Pool Enclosure | - | - |
| Closed-Withdrawn | 2023-07-26 | Pool / Pool Enclosure | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-24 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-07-19 | Pool / Pool cage | - | - |
| Closed-Revision Approved | 2023-07-14 | Windows Doors / Added Chair Rail, and a Picture Window to Cage Design | - | - |
| ePlan | 2023-07-13 | Pool / Pool Enclosure | - | - |
| Closed-Revision Approved | 2023-07-11 | Roofing / CHANGE POOL CAGE DESIGN TO INCLUDE ELITE ROOF AND POST PLACEMENTS | - | - |
| Screen enclosure with footers | 2023-07-07 | Screen enclosure with footers | - | - |
| ePlan | 2023-07-05 | Pool / Pool Railing 48 in. Aluminum | - | - |
| ePlan | 2023-06-29 | Pool / Pool Enclsoure | - | - |
| Screen Room with Concrete Footer | 2023-06-28 | Screen Room with Concrete Footer | - | - |
| ePlan | 2023-06-27 | Pool / Pool Enclosure replacement with small section of footer | - | - |
| ePlan | 2023-06-27 | Pool / Pool Enclosure | - | - |
| ePlan | 2023-06-27 | Pool / Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| Closed-Withdrawn | 2023-06-22 | Pool / fence for pool enclosure | - | - |
| ePlan | 2023-06-21 | Pool / Pool Enclosure | - | - |
| ePlan | 2023-06-21 | Pool / Pool Enclsoure | - | - |
| Yard rail | 2023-06-21 | Yard rail | - | - |
| Closed-Revision Approved | 2023-06-07 | Windows Doors / Revision - changed cage design to include picture windows | - | - |
| ePlan | 2023-06-07 | Pool / New Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| Carport | 2023-06-07 | Carport | - | - |
| ePlan | 2023-06-07 | Pool / New Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-06-07 | Pool / New Pool Enclosure *Inspections Done By Private Provider – eAtlantic Engineering* | - | - |
| ePlan | 2023-06-06 | Pool / Pool enclsoure | - | - |
| 4' picket with gates | 2023-06-06 | 4' picket with gates | - | - |
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_042513def2dc71066c41/work-events?limit=50JSON