Home › Companies › Mckinleyhomes › Multi-Family Scheduler
Multi-Family Scheduler
Mckinleyhomes · Active · JazzHR / ApplyToJob
Job facts
| Field | Value |
|---|---|
| Company | Mckinleyhomes |
| Title | Multi-Family Scheduler |
| Normalized title | - |
| Department / team | - |
| Location | - |
| Work model | - |
| Employment type | - |
| Salary | - |
| Status | active |
| ATS provider | JazzHR / ApplyToJob |
| Posted / first seen | — / 2026-05-30 |
| Changed / last seen | 2026-05-30 / 2026-06-22 |
Related slices
| Page | What it contains | Open |
|---|---|---|
| Company jobs | Active postings from Mckinleyhomes. | Open |
| Company breakdowns | Role, location, ATS, and work model facets for this company. | Open |
| ATS provider jobs | Active postings observed through JazzHR / ApplyToJob. | Open |
| Provider filtered search | The same provider as a filtered job collection. | Open |
| Lifecycle events | Open, update, close, and reopen events for this posting. | Open |
| Original posting | Canonical source or apply URL captured from the ATS. | Open |
Linked records
| Company | Mckinleyhomes |
| Source | ac5a9117-6dd5-435f-90fd-6739cbc6ab2a |
| ATS provider | JazzHR / ApplyToJob |
Description
SCHEDULER
The Scheduler provides expert implementation and analysis of project schedule for all projects from conceptual design phase through the course of construction. The Scheduler is responsible for the preliminary schedule, master schedule and progress updates required for each project.
Responsibilities
Preliminary Schedule Development (Preconstruction / Pre-Bid)
It is critical that schedule data be provided to the preconstruction and management team prior to construction. The Scheduler is expected to coordinate with the project team and Director of Project Controls to ensure proper development of the preliminary schedule so it can be utilized for its intended purpose. Actively participate in preconstruction meetings to understand schedule needs for upcoming projects. Review available plans, specifications, site photos, or google maps images of existing conditions, as needed for proper development of the preliminary schedule for each project. Communicate, and track receipt of required data from the preconstruction team to develop the preliminary schedule. This includes the phasing and sequencing plan, list of similar projects, required milestones, preliminary phasing durations (grading, foundation, framing, veneer, rough in, finishes, etc.). Request the Preconstruction department to provide any special activities, contract, and permit data pertaining to each project to incorporate into the preliminary schedule. Perform the required take off quantities and gather the subcontractor supplied data obtained during the preconstruction phase of the project (long lead items, grading durations, framing duration, etc.). Ensure all activities, durations, milestones, and links are properly entered into the schedule software to provide critical path activities and other data deemed critical to the preconstruction and project team. During the process of developing the preliminary schedule development, identify overlooked items, critical to the overall success of the schedule, and discuss identified items with Preconstruction, and Project team.
Master Schedule Development (Construction Phase)
The Scheduler is responsible for developing the master schedule for each project. The master schedule will be utilized as a contract basis and utilized as a baseline comparison during construction. Responsibilities include:
• Ensure the preliminary schedule is updated as required for the full development of a master schedule after a project is awarded.
• Ensure the project manager and superintendent provide additional data feedback from the trade partners during scope review to the schedule department for final development of the master schedule.
• Verify front end requirements of the contract (permitting, design deliverables, required milestones) have been identified by the project management team, and accurately represented in the project master schedule.
• Verify data is accurately entered into the software prior to issuing the final master schedule for contract attachment and field use.
• Provide schedule exhibits for contracts.
Schedule Updates:
The Scheduler is required to monitor all project activity to ensure each project is updated
every week from start of work through final completion. Responsibilities include:
• Formally request project teams provide data every week and note items requiring updating.
• Confirm field data includes accurate information obtained during the course of construction. Verify data provided by reviewing the meeting minutes, photo documentation, site visits, project logs, or other means necessary to ensure the data is generally accurate prior to updating.
• Ensure the project manager, and superintendent provide actual start and finish dates for all activities from the previous update, as well as forecasted or anticipated start and finishes dates (2-4) weeks following the update period as an accurate forecast.
• Ensure updates include up to date data from the project procurement and material tracking logs. Request information from the project team (generally requested from APM, P/E or project team) during update.
• Provide required breakout of all milestone activities, and labor data as needed for senior management and executive team review.
• Prioritize project updates, and ensure critical projects are prioritized. Endeavor to complete and turn around all updates within 48 hours from date of receipt.
• Ensure update data is properly entered into the scheduling software, to match update markup information provided by the project team.
• Analyze Critical path after update change is made, to ensure that it is logically sound, and accurately portrayed.
• Request project management, and superintendent verify updated schedule draft is accurate prior to downloading to Procore. Download all draft updates within (24) hours.
• Contact project team members as required to schedule an update by phone, or provide supplemental data as required to complete the project schedule in a timely manner.
• Provide feedback, and suggestions for improving the project schedule. Provide feedback, and analysis of changes in the critical milestones, and overall project completion data. Spot project risks with each update for review by the project team.
• Ensure project updates are properly distributed to the project team, senior management team, and Procore.
• Archive all backup and schedule data.
Candidate Skills & Qualifications
• Understands basic construction sequencing of multifamily projects.
• Proficient at reading plans and specifications. Ability to quickly review and comprehend project plans and details.
• Understands front end requirements of the project specifications pertaining to required scope of work.
• Ability to evaluate the accuracy of information provided to the department.
• Expert understanding of CPM project scheduling concepts and principals, scheduling best practices and standard scheduling methodologies recognized in the industry.
• Self-motivated and proactive – takes initiative and seeks responsibility.
• Excellent time management skills.
• Solid analytical skills.
• Keen attention to detail.
• BS Degree in Engineering, Construction Management, Building Construction from an accredited University (or 5+ years’ experience as a Primavera P6 scheduler in multifamily building construction).
• 5+ years of experience in multifamily building construction
• Proficient computer skills in Primavera P6, Microsoft Office Suite, project management software (Procore), and Bluebeam.
Full job record
| Job ID | d646481b8192d5c1211a7711c2bd94def893f543 |
| Org ID | e61de7d2-1433-4dae-b28c-fd0e4537a0ff |
| Source ID | ac5a9117-6dd5-435f-90fd-6739cbc6ab2a |
| Board ID | ac5a9117-6dd5-435f-90fd-6739cbc6ab2a |
| Provider | jazzhr |
| Provider Job Key | Lr6LDmOXat |
| Title | Multi-Family Scheduler |
| Normalized Title | — |
| Status | active |
| Active | yes |
| Location Text | — |
| Department | — |
| Team | — |
| Employment Type | — |
| Workplace Type | — |
| Remote Policy | — |
| Country | — |
| Region | — |
| City | — |
| Salary Raw | — |
| Salary Min | — |
| Salary Max | — |
| Salary Currency | — |
| Salary Period | — |
| Source URL | https://mckinleyhomes.applytojob.com/apply/Lr6LDmOXat/MultiFamily-Scheduler |
| Apply URL | https://mckinleyhomes.applytojob.com/apply/Lr6LDmOXat/MultiFamily-Scheduler |
| First Seen At | 2026-05-30 06:03:09Z |
| Last Seen At | 2026-06-22 14:35:49Z |
| Last Checked At | 2026-06-22 14:35:49Z |
| Last Changed At | 2026-05-30 06:03:09Z |
| Inactive At | — |
| Source Posted At | — |
| Source Updated At | — |
| Raw Payload Uri | s3://job-postings-prod-raw-590183727216/raw/provider=jazzhr/board=mckinleyhomes/date=2026-06-22/2026-06-22T14-35-48-770Z-8598b18af4cc89438ae4212c99cbbcfb2e125ed0d6d28a64a6fd5d698461b8bc.json |
Event Fields
{
"content_hash": "be62fdb07a888df72788d7a8cf87ef969c06f36b78fb77115e6b7a8563619602",
"source_hash": "69f68f68482dbd7ebb8b574b1acdfbc2abec5914fcc7da0735fbf81a81bf571f",
"last_changed_at": "2026-05-30T06:03:09.831Z",
"active_status": "active"
}Parsed Structured
{
"dedupe": null,
"language": "en",
"location": {
"raw": null,
"city": null,
"region": null,
"country": null,
"is_remote": false,
"confidence": null
},
"salary_max": null,
"salary_min": null,
"inferred_at": "2026-06-22T14:35:49.361Z",
"launch_scope": {
"reason": "jazzhr_production_catalog",
"included": true,
"location": {
"raw": null,
"city": null,
"region": null,
"country": null,
"is_remote": false,
"confidence": null
},
"countries": []
},
"remote_policy": null,
"salary_period": null,
"workplace_type": null,
"salary_currency": null
}Extensions
{}Native Structured
{
"detail": {
"url": "https://mckinleyhomes.applytojob.com/apply/jobs/details/Lr6LDmOXat?&",
"heading": "Multi-Family Scheduler",
"html_title": "JazzHR » Job Listings",
"canonical_url": "https://mckinleyhomes.applytojob.com/apply/Lr6LDmOXat/MultiFamily-Scheduler",
"description_html": "<div class=\"job_description\">\n\t\t\t\t\t<span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b><span style=\"font-size:16pt;\"><span style=\"line-height:107%;\">SCHEDULER</span></span></b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">The Scheduler provides expert implementation and analysis of project schedule for all projects from conceptual design phase through the course of construction. The Scheduler is responsible for the preliminary schedule, master schedule and progress updates required for each project. </span></span></span><br><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b><span style=\"font-size:12pt;\"><span style=\"line-height:107%;\">Responsibilities</span></span></b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b>Preliminary Schedule Development (Preconstruction / Pre-Bid)</b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">It is critical that schedule data be provided to the preconstruction and management team prior to construction. The Scheduler is expected to coordinate with the project team and Director of Project Controls to ensure proper development of the preliminary schedule so it can be utilized for its intended purpose. </span></span></span><ul><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Actively participate in preconstruction meetings to understand schedule needs for upcoming projects. </span></span></span></li><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Review available plans, specifications, site photos, or google maps images of existing conditions, as needed for proper development of the preliminary schedule for each project.</span></span></span></li><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Communicate, and track receipt of required data from the preconstruction team to develop the preliminary schedule. This includes the phasing and sequencing plan, list of similar projects, required milestones, preliminary phasing durations (grading, foundation, framing, veneer, rough in, finishes, etc.).</span></span></span></li><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Request the Preconstruction department to provide any special activities, contract, and permit data pertaining to each project to incorporate into the preliminary schedule.</span></span></span></li><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Perform the required take off quantities and gather the subcontractor supplied data obtained during the preconstruction phase of the project (long lead items, grading durations, framing duration, etc.).</span></span></span></li><li><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">Ensure all activities, durations, milestones, and links are properly entered into the schedule software to provide critical path activities and other data deemed critical to the preconstruction and project team.</span></span></span></li><li style=\"margin-bottom:11px;\"><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">During the process of developing the preliminary schedule development, identify overlooked items, critical to the overall success of the schedule, and discuss identified items with Preconstruction, and Project team.</span></span></span></li></ul><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b>Master Schedule Development (Construction Phase)</b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><span style=\"color:#000000;\">The Scheduler is responsible for developing the master schedule for each project. The master schedule will be utilized as a contract basis and utilized as a baseline comparison during construction. Responsibilities include: </span></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">•     Ensure the preliminary schedule is updated as required for the full development of a master schedule after a project is awarded.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">•     Ensure the project manager and superintendent provide additional data feedback from the trade partners during scope review to the schedule department for final development of the master schedule.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">•     Verify front end requirements of the contract (permitting, design deliverables, required milestones) have been identified by the project management team, and accurately represented in the project master schedule.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">•     Verify data is accurately entered into the software prior to issuing the final master schedule for contract attachment and field use.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">•     Provide schedule exhibits for contracts.</span></span></span><br><br><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b>Schedule Updates:</b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">The Scheduler is required to monitor all project activity to ensure each project is updated</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">every week from start of work through final completion. Responsibilities include:</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Formally request project teams provide data every week and note items requiring updating.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Confirm field data includes accurate information obtained during the course of construction. Verify data provided by reviewing the meeting minutes, photo documentation, site visits, project logs, or other means necessary to ensure the data is generally accurate prior to updating.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Ensure the project manager, and superintendent provide actual start and finish dates for all activities from the previous update, as well as forecasted or anticipated start and finishes dates (2-4) weeks following the update period as an accurate forecast.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Ensure updates include up to date data from the project procurement and material tracking logs. Request information from the project team (generally requested from APM, P/E or project team) during update.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Provide required breakout of all milestone activities, and labor data as needed for senior management and executive team review.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Prioritize project updates, and ensure critical projects are prioritized. Endeavor to complete and turn around all updates within 48 hours from date of receipt.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Ensure update data is properly entered into the scheduling software, to match update markup information provided by the project team.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Analyze Critical path after update change is made, to ensure that it is logically sound, and accurately portrayed.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Request project management, and superintendent verify updated schedule draft is accurate prior to downloading to Procore. Download all draft updates within (24) hours.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Contact project team members as required to schedule an update by phone, or provide supplemental data as required to complete the project schedule in a timely manner.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Provide feedback, and suggestions for improving the project schedule. Provide feedback, and analysis of changes in the critical milestones, and overall project completion data. Spot project risks with each update for review by the project team.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Ensure project updates are properly distributed to the project team, senior management team, and Procore.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Archive all backup and schedule data.</span></span></span><br><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\"><b>Candidate Skills & Qualifications</b></span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Understands basic construction sequencing of multifamily projects.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Proficient at reading plans and specifications. Ability to quickly review and comprehend project plans and details.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Understands front end requirements of the project specifications pertaining to required scope of work.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Ability to evaluate the accuracy of information provided to the department.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Expert understanding of CPM project scheduling concepts and principals, scheduling best practices and standard scheduling methodologies recognized in the industry.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Self-motivated and proactive – takes initiative and seeks responsibility.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Excellent time management skills.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Solid analytical skills.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Keen attention to detail.</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• BS Degree in Engineering, Construction Management, Building Construction from an accredited University (or 5+ years’ experience as a Primavera P6 scheduler in multifamily building construction).</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• 5+ years of experience in multifamily building construction</span></span></span><br><span style=\"font-size:11pt;\"><span style=\"line-height:107%;\"><span style=\"font-family:Calibri, sans-serif;\">• Proficient computer skills in Primavera P6, Microsoft Office Suite, project management software (Procore), and Bluebeam.</span></span></span><br><br> ",
"description_text": "SCHEDULER\n The Scheduler provides expert implementation and analysis of project schedule for all projects from conceptual design phase through the course of construction. The Scheduler is responsible for the preliminary schedule, master schedule and progress updates required for each project.\n Responsibilities\n Preliminary Schedule Development (Preconstruction / Pre-Bid)\n It is critical that schedule data be provided to the preconstruction and management team prior to construction. The Scheduler is expected to coordinate with the project team and Director of Project Controls to ensure proper development of the preliminary schedule so it can be utilized for its intended purpose. Actively participate in preconstruction meetings to understand schedule needs for upcoming projects.\n Review available plans, specifications, site photos, or google maps images of existing conditions, as needed for proper development of the preliminary schedule for each project.\n Communicate, and track receipt of required data from the preconstruction team to develop the preliminary schedule. This includes the phasing and sequencing plan, list of similar projects, required milestones, preliminary phasing durations (grading, foundation, framing, veneer, rough in, finishes, etc.).\n Request the Preconstruction department to provide any special activities, contract, and permit data pertaining to each project to incorporate into the preliminary schedule.\n Perform the required take off quantities and gather the subcontractor supplied data obtained during the preconstruction phase of the project (long lead items, grading durations, framing duration, etc.).\n Ensure all activities, durations, milestones, and links are properly entered into the schedule software to provide critical path activities and other data deemed critical to the preconstruction and project team.\n During the process of developing the preliminary schedule development, identify overlooked items, critical to the overall success of the schedule, and discuss identified items with Preconstruction, and Project team.\n Master Schedule Development (Construction Phase)\n The Scheduler is responsible for developing the master schedule for each project. The master schedule will be utilized as a contract basis and utilized as a baseline comparison during construction. Responsibilities include:\n • Ensure the preliminary schedule is updated as required for the full development of a master schedule after a project is awarded.\n • Ensure the project manager and superintendent provide additional data feedback from the trade partners during scope review to the schedule department for final development of the master schedule.\n • Verify front end requirements of the contract (permitting, design deliverables, required milestones) have been identified by the project management team, and accurately represented in the project master schedule.\n • Verify data is accurately entered into the software prior to issuing the final master schedule for contract attachment and field use.\n • Provide schedule exhibits for contracts.\n Schedule Updates:\n The Scheduler is required to monitor all project activity to ensure each project is updated\n every week from start of work through final completion. Responsibilities include:\n • Formally request project teams provide data every week and note items requiring updating.\n • Confirm field data includes accurate information obtained during the course of construction. Verify data provided by reviewing the meeting minutes, photo documentation, site visits, project logs, or other means necessary to ensure the data is generally accurate prior to updating.\n • Ensure the project manager, and superintendent provide actual start and finish dates for all activities from the previous update, as well as forecasted or anticipated start and finishes dates (2-4) weeks following the update period as an accurate forecast.\n • Ensure updates include up to date data from the project procurement and material tracking logs. Request information from the project team (generally requested from APM, P/E or project team) during update.\n • Provide required breakout of all milestone activities, and labor data as needed for senior management and executive team review.\n • Prioritize project updates, and ensure critical projects are prioritized. Endeavor to complete and turn around all updates within 48 hours from date of receipt.\n • Ensure update data is properly entered into the scheduling software, to match update markup information provided by the project team.\n • Analyze Critical path after update change is made, to ensure that it is logically sound, and accurately portrayed.\n • Request project management, and superintendent verify updated schedule draft is accurate prior to downloading to Procore. Download all draft updates within (24) hours.\n • Contact project team members as required to schedule an update by phone, or provide supplemental data as required to complete the project schedule in a timely manner.\n • Provide feedback, and suggestions for improving the project schedule. Provide feedback, and analysis of changes in the critical milestones, and overall project completion data. Spot project risks with each update for review by the project team.\n • Ensure project updates are properly distributed to the project team, senior management team, and Procore.\n • Archive all backup and schedule data.\n Candidate Skills & Qualifications\n • Understands basic construction sequencing of multifamily projects.\n • Proficient at reading plans and specifications. Ability to quickly review and comprehend project plans and details.\n • Understands front end requirements of the project specifications pertaining to required scope of work.\n • Ability to evaluate the accuracy of information provided to the department.\n • Expert understanding of CPM project scheduling concepts and principals, scheduling best practices and standard scheduling methodologies recognized in the industry.\n • Self-motivated and proactive – takes initiative and seeks responsibility.\n • Excellent time management skills.\n • Solid analytical skills.\n • Keen attention to detail.\n • BS Degree in Engineering, Construction Management, Building Construction from an accredited University (or 5+ years’ experience as a Primavera P6 scheduler in multifamily building construction).\n • 5+ years of experience in multifamily building construction\n • Proficient computer skills in Primavera P6, Microsoft Office Suite, project management software (Procore), and Bluebeam.",
"jsonld_jobposting": null
},
"list_job": {
"id": "Lr6LDmOXat",
"title": "Multi-Family Scheduler",
"detailUrl": "https://mckinleyhomes.applytojob.com/apply/jobs/details/Lr6LDmOXat?&"
},
"detail_errors": []
}Get this page with API
Rendered from the bluedoor Job Postings API. Reproduce it:
GET https://api.bluedoor.sh/job-postings/v1/jobs/d646481b8192d5c1211a7711c2bd94def893f543?include=descriptionJSONGET https://api.bluedoor.sh/job-postings/v1/orgs/e61de7d2-1433-4dae-b28c-fd0e4537a0ffJSONGET https://api.bluedoor.sh/job-postings/v1/sources/ac5a9117-6dd5-435f-90fd-6739cbc6ab2aJSONGET https://api.bluedoor.sh/job-postings/v1/jobs/d646481b8192d5c1211a7711c2bd94def893f543/eventsJSON