Home › Companies › Recruiting2 Ultipro Com Nae1000naes F858dd65 F751 41a6 Add7 7b877e9b6076 › Power Plant Control Room Operator › Lifecycle events
Power Plant Control Room Operator events
Lifecycle events for this job posting: created, updated, closed, and reopened. Showing 1 events on this page from 1 matching events.
| Event | Role | Field | Date |
|---|---|---|---|
| job.created | Power Plant Control Room Operator | - | 2026-06-04 |
← Job recordEnd of results
Get this page with API
Rendered from the bluedoor Job Postings API. Reproduce it:
GET https://api.bluedoor.sh/job-postings/v1/jobs/905fe193a5c6852a4c03bd8ef4c4af140d79ccce/eventsJSON