Home › Companies › Nexuse Group › Project Risk Manager (Mega Projects)
Project Risk Manager (Mega Projects)
Nexuse Group · Akron, OH · Hybrid · Active · $150,000–$180,000 / year · Lever
Job facts
| Field | Value |
|---|---|
| Company | Nexuse Group |
| Title | Project Risk Manager (Mega Projects) |
| Normalized title | - |
| Department / team | Project Delivery / Project Services |
| Location | Akron, OH, United States |
| Work model | Hybrid / Hybrid |
| Employment type | Full Time |
| Salary | $150,000–$180,000 / year |
| Status | active |
| ATS provider | Lever |
| Posted / first seen | 2026-03-26 / 2026-05-29 |
| Changed / last seen | 2026-05-29 / 2026-06-06 |
Related slices
| Page | What it contains | Open |
|---|---|---|
| Company jobs | Active postings from Nexuse Group. | Open |
| Company breakdowns | Role, location, ATS, and work model facets for this company. | Open |
| ATS provider jobs | Active postings observed through Lever. | Open |
| Provider filtered search | The same provider as a filtered job collection. | Open |
| City jobs | Active postings in Akron. | Open |
| Department jobs | Active postings in Project Delivery. | Open |
| Work model jobs | Active Hybrid postings. | Open |
| Lifecycle events | Open, update, close, and reopen events for this posting. | Open |
| Original posting | Canonical source or apply URL captured from the ATS. | Open |
Linked records
| Company | Nexuse Group |
| Source | 616e1beb-c76c-4dd5-94d0-f4626bbf4f84 |
| ATS provider | Lever |
Description
The Project Risk Manager is accountable for comprehensive and cross-functional project risk identification, prioritization, and response planning. This role facilitates risk workshops, documents and codifies risk information, analyzes risk and project information, and provides risk findings to the project team and project leadership. This role embeds risk management within the broader project controls ecosystem linking cost, schedule, change, performance, and governance to provide early warning and credible forecasts. This raises risk awareness and supports the maximizing of risk response effectiveness.
The position partners closely with engineering, procurement, construction, contracts, and senior leadership to systematically identify, quantify, mitigate, and communicate risks and opportunities across all phases of the project lifecycle from conceptual design through commissioning and startup.
This position will be based out of the Nexus Cleveland Office with up to 50% travel to Akron, OH.
Competitive Benefits
Learn more about our competitive benefits in detail.
Why Nexus?
Nexus Engineering Group, a distinguished independent full-service engineering, procurement, and construction management (EPCm) firm, provides comprehensive support to clients from concept through startup. With over a decade of demonstrated engineering and design success, Nexus stands out as the firm of choice for those valuing integrity and expertise.
At Nexus, you will be part of a talented and passionate team dedicated to excellence and innovation. We foster a collaborative and engaging work environment, making it a place where you’ll enjoy contributing to impactful projects. Joining Nexus means aligning with a firm renowned for its creativity, dedication, and relentless focus on achieving client goals.
Equal Opportunity Employer & Reasonable Accommodation
Nexus Engineering Group, Inc. is an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, disability, sex, sexual orientation, gender identity or expression, age, national origin, veteran status, genetic information, union status and/or beliefs, or any other characteristic protected by federal, state, or local law.
Nexus Engineering Group is committed to providing reasonable accommodations to qualifies individuals with disabilities throughout the application and hiring process. If you require and accommodation to participate in any part of the recruitment process please contact us at [email protected].
Sponsorship & Work Authorization
Nexus Engineering Group does not provide employment visa sponsorship of any kind, including CPT, OPT, or employment-based visas. Candidates must be currently authorized to work in the United States and must be able to maintain that authorization throughout employment without any action, filing, or sponsorship by the company. This requirement applies both at the time of hire and on a continuing basis for the duration of employment.
Third‑Party Agency Notice
Nexus Engineering Group does not accept unsolicited resumes or candidate submissions from external recruiters or agencies. We only engage approved third‑party partners under a written agreement initiated by our Talent Acquisition team for specific searches. Any resumes submitted without prior authorization or a current agreement will not be eligible for placement fees and will be considered the property of Nexus Engineering Group.
Key Accountabilities
Establish and govern an enterprise grade project-level risk management framework aligned to mega-project governance with project controls, stage gates, and executive oversight
Integrate qualitative and quantitative risk analysis with cost and schedule forecasting to support contingency setting, forecasting, and project management decisions
Serve as an independent, objective advisor to project leadership on project health, uncertainty, and emerging threats with authority to challenge assumptions and forecasts
Enable proactive, analytics-based decision-making through clear risk reporting, trends, and early warning indicators through integrated cost/schedule analytics and scenario modeling.
Embed a strong risk culture across the project team, emphasizing risk ownership, monitoring, mitigation execution, and accountability
Own integration of risk into project forecasts and contingency strategy
Core Responsibilities
Develop and maintain the project risk management plan, risk taxonomy, scoring criteria, and governance cadence
Lead structured, cross functional risk identification and mitigation workshops across engineering, procurement, construction, and commissioning
Maintain a high-quality, audit ready risk register with clear risk statements, ownership, triggers, and residual risk
Perform cost and schedule quantitative risk analysis, quantifying uncertainty into probabilistic cost and schedule forecasts
Validate and recommend contingency levels based on quantitative analysis, track risk burndown, and assess mitigation effectiveness over time
Lead integration with project controls on baseline strategy, forecast credibility, progress measurement, and performance trends
Evaluate supply chain and execution risks, including long lead equipment, fabrication, logistics, labor, productivity, and site constraints and assess impact on cost, schedule and execution strategy.
Interface with contracts and commercial teams to assess risk allocation, change exposure, and claims risk
Monitor regulatory, permitting, interconnection, and stakeholder related risks
Produce concise executive level dashboards, narratives, and decision support materials
Support stage gate reviews, independent project assessments, and assurance activities
Perform Monte Carlo based Cost and Schedule Risk Analysis
Define and standardize risk workshop methodology and facilitation approach
Qualifications
Bachelor’s degree in Engineering, Construction Management, Project Management, or related discipline
8+ years of experience in project analysis, risk management, project controls, or major capital project delivery
Experience supporting large megaprojects ($500M+; multibillion preferred)
Proficient in project governance methodologies like the Project Definition Rating Index (PDRI) and Front End Loading (FEL) Index
Strong understanding of integrated project controls, including cost, schedule, risk, change, and performance management
Experience capturing and documenting lessons learned
Demonstrated experience applying quantitative risk analysis to real world project decisions
Ability to translate complex project data into clear, defensible insights for senior leadership
Excellent facilitation, analytical, writing, and executive communication skills
Preferred – strong understanding of the project lifecycle, information maturity
Preferred – demonstrated ability to manage information uncertainty to drive proactive risk management
Experience in EPC/EPCm environments on complex, multi-stakeholder projects
Demonstrated ability to influence senior stakeholders and drive risk-informed decision making.
Full job record
| Job ID | 54da463ebaf42a113e03b1d4db3f88e2b2cff5fb |
| Org ID | 1c0172bf-7243-4175-a03c-7eaf7529d038 |
| Source ID | 616e1beb-c76c-4dd5-94d0-f4626bbf4f84 |
| Board ID | 616e1beb-c76c-4dd5-94d0-f4626bbf4f84 |
| Provider | lever |
| Provider Job Key | 41afc655-d722-4fcf-99cd-f871c1acbcd3 |
| Title | Project Risk Manager (Mega Projects) |
| Normalized Title | — |
| Status | active |
| Active | yes |
| Location Text | Akron, OH |
| Department | Project Delivery |
| Team | Project Services |
| Employment Type | Full-time |
| Workplace Type | hybrid |
| Remote Policy | hybrid |
| Country | United States |
| Region | OH |
| City | Akron |
| Salary Raw | USD 150000-180000 per-year-salary |
| Salary Min | 150,000 |
| Salary Max | 180,000 |
| Salary Currency | USD |
| Salary Period | year |
| Source URL | https://jobs.lever.co/nexuse-group/41afc655-d722-4fcf-99cd-f871c1acbcd3 |
| Apply URL | https://jobs.lever.co/nexuse-group/41afc655-d722-4fcf-99cd-f871c1acbcd3/apply |
| First Seen At | 2026-05-29 06:59:57Z |
| Last Seen At | 2026-06-06 20:30:05Z |
| Last Checked At | 2026-06-06 20:30:05Z |
| Last Changed At | 2026-05-29 06:59:57Z |
| Inactive At | — |
| Source Posted At | 2026-03-26 15:31:06Z |
| Source Updated At | — |
| Raw Payload Uri | s3://job-postings-prod-raw-590183727216/raw/provider=lever/board=nexuse-group/date=2026-06-06/2026-06-06T20-30-04-779Z-605094c2ff0ba2c085fae55dafe4dfbe6a5d8a59be89182afce1c4fbbbc843ee.json |
Event Fields
{
"content_hash": "0bdf473548be9f9ae43dcc18e46c7ed54b6ea41ced8579fc851fc303ce65f34b",
"source_hash": "e6f5a1790c4c3c27760cfcfeb2f8ead04589f9dc14b7b4ae065806423ee7e3d3",
"last_changed_at": "2026-05-29T06:59:57.313Z",
"active_status": "active"
}Parsed Structured
{
"language": "en",
"location": {
"raw": "Akron, OH",
"city": "Akron",
"region": "OH",
"country": "United States",
"is_remote": false,
"confidence": 0.9
},
"salary_max": 180000,
"salary_min": 150000,
"inferred_at": "2026-06-06T20:30:05.821Z",
"launch_scope": {
"reason": "english_us_canada",
"included": true,
"language": "en",
"location": {
"raw": "Akron, OH",
"city": "Akron",
"region": "OH",
"country": "United States",
"is_remote": false,
"confidence": 0.9
},
"countries": [
"United States"
]
},
"remote_policy": "hybrid",
"salary_period": "year",
"workplace_type": "hybrid",
"salary_currency": "USD"
}Extensions
{}Native Structured
{
"lists": [
{
"text": "Key Accountabilities ",
"content": "<div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"1\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Establish and govern an enterprise grade project-level risk management framework aligned to mega-project governance with project controls, stage gates, and executive oversight</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"2\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Integrate qualitative and quantitative risk analysis with cost and schedule forecasting to support contingency setting, forecasting, and project management decisions</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"3\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Serve as an independent, objective advisor to project leadership on project health, uncertainty, and emerging threats with authority to challenge assumptions and forecasts</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"4\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Enable proactive, analytics-based decision-making through clear risk reporting, trends, and early warning indicators through integrated cost/schedule analytics and scenario modeling.</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"5\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Embed a strong risk culture across the project team, emphasizing risk ownership, monitoring, mitigation execution, and accountability</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"1\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"6\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Own integration of risk into project forecasts and contingency strategy</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n</div>"
},
{
"text": "Core Responsibilities ",
"content": "<div>\n<div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"1\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Develop and maintain the project risk management plan, risk taxonomy, scoring criteria, and governance cadence</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"2\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Lead structured, cross functional risk identification and mitigation workshops across engineering, procurement, construction, and commissioning</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"3\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Maintain a high-quality, audit ready risk register with clear risk statements, ownership, triggers, and residual risk</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"4\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Perform cost and schedule quantitative risk analysis, quantifying uncertainty into probabilistic cost and schedule forecasts</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"5\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Validate and recommend contingency levels based on quantitative analysis, track risk burndown, and assess mitigation effectiveness over time</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"6\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Lead integration with project controls on baseline strategy, forecast credibility, progress measurement, and performance trends</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n</div>\n<div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"7\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Evaluate supply chain and execution risks, including long lead equipment, fabrication, logistics, labor, productivity, and site constraints and assess impact on cost, schedule and execution strategy.</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"8\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Interface with contracts and commercial teams to assess risk allocation, change exposure, and claims risk</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"9\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Monitor regulatory, permitting, interconnection, and stakeholder related risks</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"10\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Produce concise executive level dashboards, narratives, and decision support materials</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"11\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Support stage gate reviews, independent project assessments, and assurance activities</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"12\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Perform Monte Carlo based Cost and Schedule Risk Analysis</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"2\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"13\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Define and standardize risk workshop methodology and facilitation approach</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n</div>\n</div>"
},
{
"text": "Qualifications ",
"content": "<div>\n<div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"1\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Bachelor’s degree in Engineering, Construction Management, Project Management, or related discipline</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"2\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">8+ years of experience in project analysis, risk management, project controls, or major capital project delivery</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"3\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Experience supporting large megaprojects ($500M+; multibillion preferred)</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"4\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Proficient in project governance methodologies like the Project Definition Rating Index (PDRI) and Front End Loading (FEL) Index</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"5\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Strong understanding of integrated project controls, including cost, schedule, risk, change, and performance management</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"6\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Experience capturing and documenting lessons learned</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"7\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Demonstrated experience applying quantitative risk analysis to real world project decisions</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"8\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Ability to translate complex project data into clear, defensible insights for senior leadership</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"9\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Excellent facilitation, analytical, writing, and executive communication skills</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"10\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Preferred – strong understanding of the project lifecycle, information maturity</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"11\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Preferred – demonstrated ability to manage information uncertainty to drive proactive risk management</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n</div>\n<div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"12\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Experience in EPC/EPCm environments on complex, multi-stakeholder projects</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n<div>\n<ul role=\"list\" style=\"list-style-type: disc;\">\n<li aria-setsize=\"-1\" data-leveltext=\"\" data-font=\"Symbol\" data-listid=\"3\" data-list-defn-props=\"{"335552541":1,"335559685":720,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"multilevel"}\" data-aria-posinset=\"13\" data-aria-level=\"1\" role=\"listitem\">\n<p><span data-contrast=\"auto\">Demonstrated ability to influence senior stakeholders and drive risk-informed decision making.</span><span data-ccp-props=\"{"134233117":true,"134233118":true,"201341983":2,"335559740":300}\"> </span></p>\n</li>\n\n</ul></div>\n</div>\n</div>"
}
],
"country": "US",
"createdAt": 1774539066144,
"updatedAt": null,
"categories": {
"team": "Project Services",
"location": "Akron, OH",
"commitment": "Full-time",
"department": "Project Delivery",
"allLocations": [
"Akron, OH",
"Cleveland, OH",
"Maumee, OH",
"Oak Brook, IL"
]
},
"salaryRange": {
"max": 180000,
"min": 150000,
"currency": "USD",
"interval": "per-year-salary"
},
"workplaceType": "hybrid"
}Get this page with API
Rendered from the bluedoor Job Postings API. Reproduce it:
GET https://api.bluedoor.sh/job-postings/v1/jobs/54da463ebaf42a113e03b1d4db3f88e2b2cff5fb?include=descriptionJSONGET https://api.bluedoor.sh/job-postings/v1/orgs/1c0172bf-7243-4175-a03c-7eaf7529d038JSONGET https://api.bluedoor.sh/job-postings/v1/sources/616e1beb-c76c-4dd5-94d0-f4626bbf4f84JSONGET https://api.bluedoor.sh/job-postings/v1/jobs/54da463ebaf42a113e03b1d4db3f88e2b2cff5fb/eventsJSON