bluedoor data·Job Postings API·bluedoor.sh ↗

HomeCompaniesFoxconnassemblyllcPCB Final Quality Control - Swing Shift (NVD)Lifecycle events

PCB Final Quality Control - Swing Shift (NVD) events

Lifecycle events for this job posting: created, updated, closed, and reopened. Showing 1 events on this page from 1 matching events.

EventRoleFieldDate
job.createdPCB Final Quality Control - Swing Shift (NVD)-2026-05-30
Job recordEnd of results
Get this page with API

Rendered from the bluedoor Job Postings API. Reproduce it:

GET https://api.bluedoor.sh/job-postings/v1/jobs/374ad4d129dc1d99f3b4603e2bb95ab289996d2e/eventsJSON