bluedoor data·Job Postings API·bluedoor.sh ↗

HomeCompaniesPDWFinal Release Verification InspectorLifecycle events

Final Release Verification Inspector events

Lifecycle events for this job posting: created, updated, closed, and reopened. Showing 2 events on this page from 2 matching events.

EventRoleFieldDate
job.closedactive_statusactive_status2026-06-20
job.createdFinal Release Verification Inspector-2026-05-29
Job recordEnd of results
Get this page with API

Rendered from the bluedoor Job Postings API. Reproduce it:

GET https://api.bluedoor.sh/job-postings/v1/jobs/1dacb35da7e98ef121b536a27344cc1deac74428/eventsJSON