Home › Contractors › contractor firm_83000aeb968f7eb29ea6 › Work events
Work events
Permits and public work events attributed to this contractor. Showing 7 rows on page 1.
| Work event | Date | Category / type | County | Value |
|---|---|---|---|---|
| ePlan | 2023-10-13 | Replacing the existing 200amp 3 phase main breaker panel in unit #2 which is located in the back half of the building. | - | - |
| Replacing the existing 200amp main Breaker panel with new... | 2023-10-09 | Replacing the existing 200amp main Breaker panel with new replacing grounding system | - | - |
| Replace the existing meter can or meter terminals Due to ... | 2023-09-20 | Replace the existing meter can or meter terminals Due to burnt lug replace Feeder wires from meter to 200amp disconnect | - | - |
| Replacing bent riser meter can and grounding | 2023-08-24 | Replacing bent riser meter can and grounding | - | - |
| Replace existing meter and grounding | 2023-08-03 | Replace existing meter and grounding | - | - |
| Replace existing Challenger Panel with new SQD | 2023-08-03 | Replace existing Challenger Panel with new SQD | - | - |
| Replacing the existing 200amp Zinsco main breaker panel w... | 2023-07-11 | Replacing the existing 200amp Zinsco main breaker panel with new 200amp main breaker SQ D panel | - | - |
End of resultsBack to contractor
Get this page with API
Rendered from the bluedoor Licensed Contractors API. Reproduce it:
GET https://api.bluedoor.sh/licensed-contractors/v1/contractors/firm_83000aeb968f7eb29ea6/work-events?limit=50JSON